TROUBLESHOOTING AND REPAIR

F-42

 

STATOR/ROTOR REMOVAL AND REPLACEMENT (continued)

FIGURE F.14 – GENERATOR AND ENGINE LOCATION

GENERATORENGINE

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

PROCEDURE

1.Remove control panel cove by removing the 20 screws with a 3/8” nutdriver.

2.Remove the right case side by removing the 5 screws using a 3/8” nutdriver.

3.Make sure the run/off switch on the rear of the engine is in the off position. Remove the gas line from the engine by closing the gas valve and pinching open the clip using a pair of needlenose pliers.

4.Label and remove all of the leads that are com- ing up from the center hole in the control box from the stator. See Wiring Diagram.

5.The engine can be removed by unbolting the two 9/16” anchor bolts from the engine side and the two 1/2” bolts from the generator side. Pull the engine/generator from the right side of the welder.

BULLDOG® 140

Page 90
Image 90
Lincoln Electric SVM208-A service manual STATOR/ROTOR Removal and Replacement, Generatorengine