TROUBLESHOOTING AND REPAIR

F-48

 

STATOR/ROTOR REMOVAL AND REPLACEMENT (continued)

FIGURE F.19 – CHECKING ROTOR-STATOR AIR GAP

Return

Return to Section TOC

Return

Return to Master TOC

FEELER GAUGE

ROTOR

STATOR

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

6. Install the bottom two end bracket thru-bolts.

NOTE: The flat washer goes on the top right hand

thru-bolt for the green ground wire.

7.Tap the end bracket with the mallet as neces- sary to position it. Tighten the bolts to 22 - 25 ft lbs. Alternate tightening in order to pull the assembly together evenly. As you tighten, look through the brush housing access door and watch the bearing to judge end bracket move- ment and alignment.

8.Check the rotor-stator air gap with the long .010 feeler gauge. The measurement is taken through the brush holder access door; see Figure F.19. Turn the engine with the recoil starter rope slightly so that the rotor “iron” is up to take the measurement. (The rotor has two flat sides, which are not measured for air gap.) Slide in the gauge. Then rotate the shaft 180 degrees and measure again. If the gauge does not clear, loosen the four end bracket thru-bolts, reposition the end bracket, retighten the bolts, and recheck the air gap. Repeat until the prop- er .010 minimum air gap is achieved.

9.Tighten the end bracket support nuts and lock washers. Remove the 2 X 4 engine support.

10.Reinstall the brush holder assembly. Refer to the topic BRUSH REMOVAL AND REPLACEMENTin this section of the manual.

11.Slide the control box back into place. Pull the stator and ground wire up through.

12.Remove the control panel (2 screws) and reconnect the output terminal leads (W1, W2). Install a new cable tie to hold the leads togeth- er. Reconnect the stator wire/harness molex coupling. Install the 6 screws that hold the con- trol panel to the box.

13.Connect the engine flywheel alternator cou- pling.

14.Lift the control box and screw in the rubber mountings. Set the control box onto the mountings.

15.Install the front left hand washer and nut that anchors the control box to the stator frame. Position the reactor and install the remaining washers and nuts.

16.Check all terminal connections for clearance, grounding, and tightness.

17.Replace the top cover to the control box and tighten the 4 nuts.

18.Conduct the RETEST AFTER REPAIRpro- cedure, the following topic in this section of the manual.

BULLDOG® 140

Page 96
Image 96
Lincoln Electric SVM208-A service manual Figure F.19 Checking ROTOR-STATOR AIR GAP