!Line Processing of Main Unit

Screw(D Sub)

Tape

Screw

Screw

 

Screw

 

 

Connect.

Safety Working

I/O PCB ASSY

Safety Working

Insert the surplus

length between the Modem Connector and

the LAN Connector.

Screw

 

HDD Guide Plate

 

 

 

 

 

 

 

 

When inserting,

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

use the jig to receive

Between the Main Board

 

 

 

 

 

 

 

 

the Cable.

and the Top Case

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

White

Modem

Connector

LAN

Connector

Connect it first when setting the Main Board. Then attach the Coin Battery to the Top Case.

Screw

0~2mm

0~0.5mm

Bat Cushion Screw

FFC CN

Stopper

Avoid running over the Modem Connector and the LAN Connector (yellow area).

MAIN PCB

Main PCB Switch

Connect the FFC.

After connecting the FFC, shape it over the Board.

Bat Con Angle

0~0.5mm

Screw

Then insert the shaped part to the BAT Connector.

Match to

Attach before

the edge

setting

of the

the Main PWB.

Board.

Tape

 

 

 

 

 

 

 

 

 

Wipe off using alcohol

before attaching.

FFC Spacer

!Line Processing of the Lithium Battery

Lithum Battery

Connect the Cable to the Connector CN3 of the Board. (Right angle type)

CN3

After attaching the Cushion for Lithum Battery,

set the Lithum Battery as shown below.

 

Safety Working

 

Attach the Lithum Battery on the Cushion.

 

Draw the Lead Wire toward the end of the Board.

 

Arrange the surplus length of the Lead Wire

 

as shown below.

Cushion for Lithum Battery

Attach on the IC14 (Super I/O).

Attach the white adhesive surface to the IC side.

Pass the Lead Wire through the notch of the Board.

End of the Board.

7-23

Page 42
Image 42
Matsushita CF-18NHHZXBM Line Processing of Main Unit, Line Processing of the Lithium Battery, CN3, HDD Guide Plate