!Putting of the PAD Insulation Sheet

TOP Case Assy

0~0.5mm

Front side

TP Bottom Tape

Don’t overflow.

Core side

Core side

Right side

PAD Card Insulation Sheet

0~0.5mm

!Assembly of TOP CASE ASSY

Kensington Plate

0~0.5mm

0~0.5mm

Tape

Kensington Lock Plate

Remove the Release Paper and attach it to the Top Case.

0~0.5mm

Kensington Plate

0~0.5mm 0~0.5mm

0~0.5mm

HDD Side Spacer

0~0.5mm

After connecting the FFC Details of cable arrangement

Keep the 1 mm space between

the Top Case and the rib.

Gasket

Gasket

Attach to the indent portions for the USB.

 

 

 

 

LED PCB

 

 

 

 

Fit it to the pin

 

 

 

 

and attach it.

 

 

 

 

0~0.5mm

 

 

 

 

0~0.5mm

PAD PCB

Screw

 

 

 

 

 

 

 

 

 

SW Spring

Detail of "A"

 

 

 

 

Check a lock after the insertion

PCMCIA Cushion

A

 

 

 

 

Touch PAD

 

Remove the Release

 

 

Paper and attach it.

 

 

After attaching it,

 

Attach here.

connect to the Connector.

 

 

(0 ~ 0.3mm)

 

 

 

0~0.5mm

 

 

 

 

 

Safety Working

 

Check a lock after the insertion

Click Button Sheet

Avoid running over the side. Apply the load to attach.

30 to 40N (3.0 to 4.0Kgf)

Hook on the protrusions of the boss and the Power Switch.

7-21

Page 40
Image 40
Matsushita CF-18NHHZXBM service manual Putting of the PAD Insulation Sheet, Assembly of TOP Case Assy