9.3.3.6. Assembly of the Wireless LAN Module / MODEM

<W-LAN Module preparation>

 

Connection

Antenna Board (MAIN)

 

Processes to board’s just beside.

Connection

W-LAN Module

Antenna Board (SUB)

-Work in midair prohibition when module is connected with antenna board. -Connects applying the board to the receiving stand.

(For the distortion prevention of the board)

<MODEM preparation 1>

Connection

MODEM

 

 

 

 

From the tube edge

Safety work

 

 

 

 

The position is decided with a

 

 

 

 

2-5mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The film is

 

34-36 treatment device.

 

 

 

 

 

 

 

 

 

 

 

 

 

wrapped

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Put out the position with the tube

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

drawn to the Jack side

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODEM Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.0

2.0

 

2.0

 

 

 

2.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The PET Tape (19mmx25mm)

Safety work

 

 

 

 

 

 

is wrapped

 

 

 

 

 

 

 

 

 

 

 

 

<MODEM preparation 2>

<MODEM preparation 3>

The remainder is affixed

 

Board externals

EMI Sheet’s for MDC

on an opposite side

0-2

 

tape externals

Safety work

MDC EMI

 

1-2

 

Sheet

 

 

 

 

Safety work

 

 

 

Cable is processed

PET Tape

to the board side

(19mmx25mm) Fit Board’s hole to

 

 

 

Conductive Cloth’s hole.

 

 

Safety work

 

45

Page 45
Image 45
Matsushita CF-Y5LWVYZ 1 2 service manual Assembly of the Wireless LAN Module / Modem, Safety work