9.3.6.Assembly knowhow of the Body

9.3.6.1.Keyboard preparation

 

Boss central standard

both sides tape

0 1mm

Keyboard

both sides tape

 

Affixes between square holes

Affixes between square holes

Square hole extemals standard 01mm

Affixes between square holes

KBD Tape

From a square hole extemals 0-2mm

9.3.6.2. Installation of Main Board

MAIN PWB A'SSY

Main PWB A'ssy

is installed

Attention when Main

Pwb A'ssy is installed

FIG 1

It is confirmed that W-LAN SW is turning off(Left) before building in of BOTTOM CASE.

(OFF:Left ON:Right)

Attention of using properly of BOTTOM CAB A'SSY (Confirms by the hinge fixation boss in the cabi in the under) YA-0=It is penetration and a hole of about 2.0.

The ANT PWB connection cable passes the FCC under

BOTTOM CAB A'SSY:

Attention of using properly

FIG1

DIMM COVER

FIG1

Attention of using properly MK1=Only Dimm Cover Excluding MK1=

There is heat radiation part affixation

There is BT and for the model The flaking off paper of the cushion is peeled off, installs in the cabinet in the under, and affixes .

67

Page 67
Image 67
Matsushita CF-Y5LWVYZ 1 2 Assembly knowhow of the Body, Keyboard preparation, Installation of Main Board, Main PWB Assy