9.3.3.7. Insert the Main Board

(Attention)

-The board is set in the receiving treatment device and works.

-When carrying to the following process, a special palette is used. (The FPC bend in YB respect is prohibited)

Safety Work

Pressurizes with the battery the finger is put in the PCMCIA slot.

 

 

 

 

 

 

 

 

 

 

Safety Work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

After the pin by which the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coin Battery Affixes

to the sheet..Does not get on the board.

position is decided is inserted, a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

fixed screw is tightened.

 

 

 

1-3mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The cable is processed to this part remaining. Does

 

 

 

After the screw is tightened, the

 

 

 

 

 

 

 

 

 

not get on a top side in the main body of the battery.

 

 

 

pin is detached.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Edge side central distribution

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4mm-2

 

Screw

 

 

 

 

 

Tape

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slit externals match

 

 

 

 

 

 

 

 

 

 

 

 

 

(DXQT2+E6FNL)

 

 

 

 

 

0-1.5mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Affixation

 

 

 

 

 

 

*Does not overlap in the slit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W-LAN Module Preparation goods

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

within this range

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Safety Work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(DXQT2+D25FNL)

 

 

 

 

Fit to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The adsorption sheet of the

 

 

 

 

 

connector

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

axis for fixation is peeled off

 

 

 

 

 

 

 

 

 

affixation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Memory Spreader

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

before installs. (2 places)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(DXQT2+D25FNL)

 

 

 

 

 

 

 

 

Safety Work

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODEM Preparation goods

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The adsorption sheet of the

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

axis for fixation is peeled off

 

 

 

 

 

 

 

(DXQT2+D25FNL)

 

 

 

 

 

 

 

before installs. (2 places)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Valley case

Bend with 0.5 or more (Use the treatment device)

AL Sheet externals standard

MODEM CN installation

Board Label

 

LAN CN installation

0 2mm

Character

 

 

 

 

 

 

direction (Upper)

 

 

 

 

 

 

 

 

 

 

 

MODEM LAN Holder

Installs so that the cable should not cross.

9.3.3.8. Note of Wireless LAN module is inserted

<Notes when Wireless LAN Module is inserted>

Please do Board’s insertion and extraction correctly according to the direction and the procedure shown in the figure below

Please go from parallel respect to mounting Board in Board’s insertion and extraction within the range of 5 -10 Please insert in the interior completely when you insert Board.

46

Page 46
Image 46
Matsushita CF-Y5LWVYZ 1 2 service manual Insert the Main Board, DXQT2+E6FNL, DXQT2+D25FNL