with the smaller bracket screws. Then attach the remaining bracket to the other side of the Switch.

B.After attached both mounting brackets, position the 24 10/100TX plus 2 SFP/Copper managed POE switch in the rack by lining up the holes in the brackets with the appropriate holes on the rack. Secure the switch to the rack with a screwdriver and the rack-mounting screws.

[Note] For proper ventilation, allow about at least 4 inches (10 cm) of clearance on the front and 3.4 inches (8 cm) on the back of the Switch. This is especially important for enclosed rack installation.

Power On

Connect the power cord to the power socket on the rear panel of the Switch. The other side of power cord connects to the power outlet. The internal power supply of the Switch works with voltage range of AC in the 100-240VAC, frequency 50~60Hz. Check the power indicator on the front panel to see if power is properly supplied.

11

Page 19
Image 19
Milan Technology MIL-SM2401MAF manual Power On