Mitsubishi Electronics 882.00207.00 Site Requirements, Mounting Configurations, Machine Mount

Models: 882.00207.00

1 103
Download 103 pages 37.01 Kb
Page 32
Image 32

4.If equipped, adjust the four leveling bolts on the floor stand blender support rails.

5.Mount the material conveying system receivers on the top of the blender supply hoppers.

6.Align the weigh hopper on the load cell brackets. Carefully adjust the load cell brackets to ensure that the weigh hopper is centered on the brackets without rocking. If for some reason the locating tabs do not align with the weigh hopper, they can easily be loosened and adjusted.

Caution! Use extreme care when tightening bolts on top of the load cells so you do not spring the load cells. The load cells are extremely delicate and should be treated with care!

7.Check the slide gate metering assemblies to ensure they are not damaged, and will slide back and forth freely. These are the most important items on the blender, besides the load cell and weigh hopper assemblies.

Site Requirements

This section describes site requirements in detail. These requirements are broken down into mechanical mounting, electrical connections and pneumatic connections. Since the Slide Gate Blender is available in several different mounting arrangements, it is necessary for the reader to become familiar with the different arrangements.

Mounting Configurations

The Slide Gate System is available in (3) three basic mounting arrangements. They are:

Machine Mount

Mezzanine Mount

Floor Mount

Machine Mount

In a machine mounting application of the Slide Gate unit, there are a few items to review before placement and mounting of the blending system begins.

First, verify the machine flange dimensions match the Slide Gate blender flange (if the optional pre- drilled holes were ordered). The Slide Gate blender can also be equipped with an optional cast throat section with a drain port. This will bolt under the bottom plate of the blender.

Verify that the machine throat is physically capable of supporting the Slide Gate blending system with a full load of material and vacuum loading equipment installed.

Note: While in operation, the Slide Gate blender applies horizontal and vertical pressures to the mounting flange. If there is a question as to the mechanical stability of a mounting flange, contact the manufacturer’s engineering department.

Verify all clearances on the top and beside the processing machine. This is to insure that all motors, hoppers, control panels, etc. have adequate room for proper operation and servicing.

Refer to the assembly drawing with the unit for actual height and width dimensions.

Note: Allow at least 36” clearance around blender to provide adequate room for cleaning, servicing, etc.

882.00207.00

Chapter 3: Installation

31 of 102

Page 32
Image 32
Mitsubishi Electronics 882.00207.00 specifications Site Requirements, Mounting Configurations, Machine Mount