EN-16
6. Schedule setting

6.1. Creation of projector group

Multiple projectors can be controlled and batched by sor ting groups.
Also,eachgroupcanseteachtimeofthepowersupplyON/OFFeveryday.
SincethescheduleofthepowersupplyON/OFFisperformedbyeachgr oup,theprojectorwhichyouliketo
operate at the same schedule should be integrated into the same group.
When Power ON and Power OFF are enabled, their time settings are indicated on the schedule lis t.
[Example] When setting the schedule for the group “group 1” to turn the power supply ON at 9:00 on Monday,
turning OFF at 17:00 on the same day, ON at 8:30 on Thursday, and OFF at 17:40 on Friday.
Group name
Day of the week
Time of power supply ON
Time of power supply OFF
When validating the setting,
putacheckmarkinthebox.
Schedule list
TimeofpowersupplyON/OFF
(1) Select “Add New Group” from “Configuration” of the menu bar.
• “AddNewGroup”windowisdisplayed.
(2) Input the group name to be created in the “Group N ame” column (within 16 characters in
one-byte alphanum eric symbol).
(3) Select the day of the week to be set for the time of the power s upply ON/OFF.
(4) Only when setting the time of the power supp ly ON, set the time in the “Power ON” column,
and put a check mark in the “E nable” box.
(5) Only when setting the time of power supply O FF, set the time in the “Power OFF” column,
and put a check mark in the “E nable” box.
(6) When there are more than one day of the week to be set for t he power supply ON/OFF
schedule, repeat the pr ocedure (3) to (5).
(7) Click [Add].