EN-17
6. Schedule setting
<Note>
• ThepowersupplyONandthepowersupplyOFFcannotbeselectedatthesametimeofthes amedayofthe
week.
• TheScheduleSettingwillbeexecutedwhile“ProjectorViewGlobal+”isinoperation.
• Dependingonusageconditions,suchaswhentherearesom anyprojectorsthatyouneedtocontrol,thetime
tobeexecutedbythepowersupplycontrolmaydeviatefromthesettingtimeoftheschedule.
• WhenutilizingtheNetworkTimeProtocol(NTP)functionontheInternet,thesche duleoperationmaynotbe
executedbecausethesettingtimeoftheschedulejumpsover.
• Whentheautomatictimeadjustmentbysummer��timeisvalid,thescheduleoperationmaynotbeexecuted
because the time is automatically adjusted before and after switching over.

6.2. When changing schedule set ting

(1) Select a group which you like to change from the Group sel ect pull-down menu on the main
screen.
(2) Select “Edit Schedule Setting” from “Co nfiguration” of the menu bar.
• “EditScheduleSetting”windowisdisplayed.
(3) Change the contents which you like to correct, and cl ick [Save].
• Correctedcontentsarereected.