Figure 4 illustrates the location of the major components for the C30HDZ Concrete Pump. The function of each component is described below:
1. Discharge Cone – Connect 3" elbow to this discharge port, then connect 3" x 2" reducer to elbow.
2.Discharge Cone Safety Latch – When towing of the pump is required, ALWAYS secure the discharge cone to latch located on the manifold.
3. Rear Running Lights – ALWAYS check and make sure both the right and left running lights are functioning correctly before towing the pump.
4.Hopper – Concrete from a
5.Safety Grill – The safety grill should be locked at all times when the pump is being towed. Under normal working conditions, raise and place the safety grill on the support hooks which are located on splash guard.
6.Shaft Pulley
7.Compartment Hood – NEVER operate the pump with the hood removed. Installed on the pump frame is a safety inter- lock device which prevents the engine from starting if the hood is removed or in the up position (open).
8.Hood Fastener – When the hood is in the down position, secure the rubber latch to this fastener.
9.Hood Lift Handle – Grip this handle, pull upward then back to raise the compartment hood.
10.Control Box – Contains the mechanical and electrical components required to run the pump. Below is a list of those components:
■Throttle Control
■Choke Control
■Low Oil Pressure Indicator
■Battery Charge Indicator
■Water Temperature Indicator
■Ignition Switch
■Remote Connector
PUMP COMPONENTS
11. Fuel Tank/Cap – Fill with unleaded fuel. Fuel tank (cell) holds approximately 11 gallons (41 liters).DO NOT top off fuel.Wipe up any spilled fuel immediately
12. Tow End Jack Stand – Use this jack stand to level and support the pump.
13. Tow Hitch Coupler – Requires a
14. Safety Chain – ALWAYS attach safety chain to the towing vehicle. NEVER! tow the pump with the safety chain unattached.
15. Engine Stop Device
16. Grease Port Console – This console allows for the remote lubrication of components on the pump.
17. Access Door – There are four access doors on the pump. Remove these door to gain access to drive and piston assemblies when maintenance is required.
18. Drive Chain – Keep this chain properly lubricated and aligned at all times. Lubricate this chain as specified in the maintenance section of this maintenance.
19. Rubber Latch – Secure this rubber latch to the hood fastener whenever the pump is in use or being towed.
20. Tires Ply– The tire ply (layers) number is rated in letters; This trailer uses
21. Chock Blocks – Place these blocks (not included as part of your concrete pump package) under each trailer wheel to prevent rolling.
22. Pump End Jack Stand – Use this jack stand to level and support the pump.
23. Discharge Cone Release Lever – secures the discharge cone to the "Y" manifold; also relieves manifold pressure.
24. Documentation Box – Contains engine and pump operation, parts and maintenance information.
25. Lubrication Box – This box is empty when shipped from the factory. Please fill with 7 gallons ( 26.5 liters) of SAE motor oil for first time use. Also check the dual
MAYCO C30HDZ PUMP — OPERATION AND PARTS MANUAL — REV. #12 (04/03/12) — PAGE 23