Napoleon Fireplaces GDS60N manual 2.4a

Models: GDS60N

1 52
Download 52 pages 27.89 Kb
Page 28
Image 28
FIGURE 5.2.4a

28

5.2.4 VERTICAL AIR TERMINAL INSTALLATION - MODEL GDS60

!WARNING

MAINTAIN A MINIMUM 2” SPACE BETWEEN THE AIR INLET BASE AND THE STORM COLLAR.

A.

Fasten the roof support to the roof using the screws provided. The

 

 

 

 

roof support is optional. In this case the venting is to be adequately

 

 

 

 

supported using either an alternate method suitable to the authority

 

 

 

 

having jurisdiction or the optional roof support.

FIGURE 5.2.4a

 

 

 

B.

Stretch the inner flex pipe to the required length. Slip the

 

 

 

 

inner flex pipe a minimum of 2” over the inner pipe of the air

 

 

 

 

terminal connector and secure with 3 #8 screws. Seal using

 

 

 

 

a heavy bead of high temperature sealant W573-0007 (not

 

 

 

 

supplied).

 

 

 

 

C.

Repeat using the outer flex pipe, using a heavy bead of

 

ROOF SUPPORT

 

 

 

 

high temperature sealant W573-0002 (not supplied).

 

 

 

 

D.

Thread the air terminal connector / vent pipe assembly down through

 

 

INNER PIPE

 

 

 

 

the roof. The air terminal must be positioned vertically and plumb.

 

 

FIGURE 5.2.4d

 

Attach the air terminal connector to the roof support, ensuring that the

AIR

 

top of the air terminal is 16” above the highest point that it penetrates

 

 

 

 

TERMINAL

 

 

the roof.

 

CONNECTOR

E.Remove nails from the shingles, above and to the sides of the air terminal connector. Place the flashing over the air terminal connector leaving a min. 3/4” of the air terminal connector showing above

the top of the flashing. Slide the flashing underneath the sides and upper edge of the shingles. Ensure that the air terminal connector is properly centred within the flashing, giving a 3/4” margin all around. Fasten to the roof. Do not nail through the lower portion of the flashing. Make weather-tight by sealing with caulking. Where possible, cover the sides and top edges of the flashing with roofing material.

HIGH TEMPERATURE SEALANT

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background INNER FLEX PIPE

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background OUTER FLEX PIPE

F.Aligning the seams of the terminal and air terminal connector, place the terminal over the air terminal connector making sure the vent pipe goes into the hole in the terminal. Secure with the three screws provided.

G.Apply a heavy bead of weatherproof caulking 2” above the

flashing. Install the storm collar around the air terminal and slide down to the caulking. Tighten to ensure that a weather-tight seal between the air terminal and the collar is achieved.

2”Manual backgroundManual background AIR INLET Manual background BASE

CAULKING

Manual backgroundManual backgroundManual background STORM COLLAR

WEATHER SEALANT

FLASHING

H.

If more vent pipe needs to be used to reach the appliance see “HORIZONTAL

FIGURE 5.2.4e

 

AIR TERMINAL INSTALLATION” section.

 

 

 

 

24.1

 

 

 

 

W415-0788 / A / 09.22.09

Page 28
Image 28
Napoleon Fireplaces GDS60N manual 2.4a