2.INSTALLATION PROCEDURE

Install the Remote PIM System according to the following procedure. Figure 3-3and Figure 3-4show the installation procedure for the main site and the remote site.

START

Switch Setting of DAIA Card

Mounting of DAIA Card

Switch Setting of DAIC Card

Mounting of DAIC Card

Mounting of BS00 Card

Mounting of CP01 Card

BUS Cable Connection

Connection Between

Main Site and Remote Site

MP Reset

END

See Section 2.1.1

See Section 2.1.2

See Section 2.1.3

See Section 2.1.4

See Installation Procedure Manual and Circuit Card Manual.

*These procedures are required even if the main site is 1-PIM configuration.

See Section 2.1.5

See Section 2.3

See Section 2.4

Note: For the main site, this manual describes only the installation procedure exclusively required for the Remote PIM System. Refer to the Installation Procedure Manual for regular installation.

Figure 3-3 Installation Procedure for Main Site

CHAPTER 3

ND-46550 (E)

Page 16

Revision 2.0

Page 24
Image 24
NEC 151944 system manual Installation Procedure, Start