START

Unpacking*

Marking and Drilling*

Installation of Main Equipment

Connection of Battery*

Switch Setting of DAIB Card

Mounting of DAIB Card

Switch Setting of DAIC Card

Mounting of DAIC Card

Switch Setting of

Line/Trunk Circuit Cards*

Mounting of

Line/Trunk Circuit Cards

Power Failure Transfer (PFT)

See Section 2.2.1

See Section 2.2.2

See Section 2.1.3

See Section 2.2.4

See Section 2.2.6 See Section 2.2.7

See Section 2.2.9

Note 2

Cable Running to MDF*

Termination of Cables on MDF*

Connection between

Main Site and Remote Site

MP Reset

System Initialization

and System Data Entry*

Operation Test*

Cleaning and Visual Check*

Mounting of Front Cover*

END

See Section 2.3

See Section 2.4

Note 1: This manual describes only the installation procedure exclusively required for the Remote PIM System. Refer to the Installation Procedure Manual for the procedures marked by * .

Note 2: It is recommended that the Power Failure Transfer (PFT) is provided on the Remote Site in case the link between the main site and the remote site is lost.

Figure 3-4 Installation Procedure for Remote Site