Manuals
/
New Buck Corporation
/
Household Appliance
/
Fan
New Buck Corporation
20 Room Heater manual
Models:
20 Room Heater
1
10
62
62
Download
62 pages
31.99 Kb
7
8
9
10
11
12
13
14
<
>
Troubleshooting
Install
Preventive Maintenance / Parts Replacement
Warranty
Dimension
Maintenance
Possible Problems
Procedure
Cleaning The Unit
How to
Page 10
Image 10
Page 9
Page 11
Page 10
Image 10
Page 9
Page 11
Contents
Page
SECTION
TABLE OF CONTENTS
SECTION
SECTION
Page
SECTION
ROOM HEATER FEATURES
OPERATING CONTROLS
EPA COMPLIANCE STATUS
CATALYST WARRANTY
ACHIEVING CATALYTIC LIGHT-OFFWHEN REFUELING
CATALYST EQUIPPED
MAINTAIN PROPER DRAFT
CATALYST MONITORING
CAUTION AGAINST OVER-FIRING
ASH REMOVAL
FIREPLACE INSERT
MASONRY INSERT INSTALLATION
INSTALLATION PRECAUTIONS
SECTION
K Factors of Alternate Materials
MINIMUM CLEARANCES
ALTERNATE FLOOR PROTECTORS MATERIALS
Material
INSTALLATION PREPARATION
REQUIRED FIREPLACE DIMENSIONS
POSSIBLE TOOLS NEEDED FOR INSTALLATION
Minimum and/or maximum fireplace dimensions
Page
MOUNTING TRIM PANELS
FINAL CHECK
INSTALLATION PRECAUTION
RESIDENTIAL FREESTANDING ROOM HEATER INSTALLATION
SECTION
FLOOR PROTECTION
WALL INSTALLATION
CORNER INSTALLATION
MINIMUM CLEARANCES
WALL INSTALLATION
TOOLS FOR INSTALLATION
PREPARING THE STOVE FOR INSTALLATION
CORNER INSTALLATION
CHIMNEY
A.Ceiling Exit Using Single Wall Pipe
PREPARING THE ROOM HEATER LOCATION
DETERMINING THE CHIMNEY LOCATION
FLUE EXIT
C. Wall Exit Into Masonry Using Single Wall Pipe
B. Wall Exit into Metal Tee-Box
FIGURE 7 FLUE GAS EXIT INTO MASONRY CHIMNEY
Page
FINAL CHECK
1.Recheck the specified clearances
Parts Requirements MODEL
MOBILE HOME ROOM HEATER INSTALLATION
WARNING DO NOT INSTALL IN SLEEPING ROOM
UL Listed and factory approved Chimney Systems
TOOLS FOR INSTALLATION
FIGURE 1 WALL INSTALLATION
FIGURE 2 CORNER INSTALLATION
FLOOR PROTECTION
PREPARING THE HEATER FOR INSTALLATION
PREPARING THE ROOM HEATER LOCATION
DETERMINING THE CHIMNEY LOCATION
PROTECTIVE PAD
FINAL CHECK
INSTALLATION PRECAUTIONS
PRE-FABINSERT INSTALLATION
MINIMUM CLEARANCES INSTALLATION PREPARATION
PRE-FABFIREPLACE INSERT
Heater Installation
Heater Preparation
MINIMUM CLEARANCE TO COMBUSTIBLES
3.To complete methods 1 and
CAUTION! Do not loosen the ceramic blanket
SAFETY PRECAUTIONS
WOOD HEATER SAFETY
SECTION
MODEL 20 OPERATION
OPERATION
BUILDING A FIRE
SECTION
Align where handle rod exits face of air vent
TIPS ON FIRE BURNING
OPERATING AND SAFETY HINTS
HELPFUL HINTS
Type of
Check Chimney
PREVENTIVE MAINTENANCE / PARTS REPLACEMENT
CLEANING THE HEATER
CATALYTIC INSPECTION
a.Spread a drop cloth in front of the heater
DOOR GASKET REPLACEMENT Cold Heater
Page
Heater Related Problems
CATALYTIC TROUBLESHOOTING
CONTENTS
Chimney-RelatedProblems
DEFINITIONS
POSSIBLE PROBLEMS
Problem
TROUBLESHOOTING
HEATER RELATED PROBLEMS
Solution
Possible Cause
Problem
Solution
High Fuel Consumption
Solution
CHIMNEY-RELATEDPROBLEMS
Problem
Possible Cause
Possible Cause
Problem
Solution
3. Heavy Concentration of
3 FT
Solution
COMBUSTOR-RELATEDPROBLEMS
Problem
Possible Cause
Possible Cause
Problem
Solution
Substrate Cracking
SAFETY NOTICE
FEATURES PREPARATION INSTALLATION
OPERATION MAINTENANCE SAFETY
Zero Clearance Cabinet Model ZC20
Listed NEW BUCK CORP
RESIDENTIAL INSTALLATIONS PARTS REQUIREMENTS
INSTALLATION PRECAUTIONS
Part Description
THROUGH CATHEDRAL
SELECTING A CHIMNEY INSTALLATION AND LOCATION
THROUGH CEILING
CEILING
FRAMING CONSTRUCTION AND INSTALLATION
Page
2 In
ZC20/Model
A SINGLE HEADER MUST BE INSTALLED ABOVE CABINET
CHASE
Material
ALTERNATE FLOOR PROTECTORS MATERIALS
K Factors of Alternate Materials
Required Thickness
FIGURE 7 POWER HOOK-UP
TOP FRONT TRIM PANEL
UL Listed and Factory Approved Chimney Systems
MOBILE HOME INSTALLATIONS
PARTS REQUIREMENTS
INSTALLATION PRECAUTIONS
FRAMING CONSTRUCTION AND INSTALLATION
G.WARNING Do not install in sleeping room
RAIN CAP STORM 2 ft. COLLAR
CHASE ENCLOSURE AND CORNER LOCATION FRAMING
ALTERNATE FLOOR PROTECTORS MATERIALS
Material
POWER HOOK-UP
K Factors of Alternate Materials
Required Thickness
CLEANING THE UNIT
SAFETY PRECAUTIONS
CHIMNEY CLEANING
PREVENTIVE MAINTENANCE SAFETY PRECAUTIONS CHIMNEY
CREOSOTE-FORMATIONAND NEED FOR REMOVAL
PROCEDURE
“LIMITED WARRANTY” FOR NBC RELATED PRODUCTS
WARRANTY TIME PERIODS
NEW BUCK CORPORATION Customer Service Department