New Buck Corporation 20 Room Heater manual Table Of Contents, Section

Models: 20 Room Heater

1 62
Download 62 pages 31.99 Kb
Page 2
Image 2

TABLE OF CONTENTS

 

SECTION 1:

 

Room Heater Features

3

Important Statements

4

SECTION II:

 

Masonry Insert Installation

6

Minimum Clearances

7

Required Fireplace Dimensions

8

Tools for Installation

8

Installation Preparation: Fireplace

8

Installation Preparation: Heater

8

Installation Procedure—Direct Connect

9

Positioning the Heater

9

Mounting the Trim Panels

9-10

Final Check

11

SECTION III:

 

Freestanding Installation

12

Minimum Clearances

13

Tools for Installation

14

Installation Preparation

14

Determining the Chimney Location

15

Final Check

18

SECTION IV:

 

Mobile Home Installation

19

Parts Requirements

19

Minimum Clearances

20

Tools for Installation

20

Installation Preparation

21

Determining the Chimney Location

22

Final Check

23

SECTION V:

 

Zero-Clearance Installation

24

Minimum Clearances

26

SECTION VI:

 

Safety

28

SECTION VII:

 

Operation

29

Building a Fire

29

Operating and Safety Hints

31

Guide to Burning Qualities of Wood

31

Helpful Hints

31

SECTION VIII:

 

Manufacturer’s Suggested Preventive Maintenance

32

Catalytic Inspection

32

Catalyst Replacement

33

Door Gasket Replacement

34

Electrical Operation

35

SECTION IX:

 

Troubleshooting Guide

36

ZERO-CLEARANCE CABINET MODEL ZC20

46

SECTION I:

 

Residential Installations

47

SECTION II:

 

Mobile Home Installations

54

WARRANTY—Heater

Rear Cover

Page 2
Image 2
New Buck Corporation 20 Room Heater manual Table Of Contents, Section

FAQ

What are the minimum clearances for freestanding installation?

The minimum clearances for freestanding installation are 12 inches on the back, 12 inches on each side, and 36 inches in front.

How often should the catalyst be inspected and replaced?

The catalyst should be inspected annually and may need replacement every 2-6 years, depending on usage.

What are the recommended preventive maintenance procedures?

The recommended preventive maintenance procedures include catalytic inspection, catalyst replacement, door gasket replacement, and electrical operation check.