SECTION IV

MOBILE HOME ROOM HEATER INSTALLATION

WARNING: DO NOT INSTALL IN

SLEEPING ROOM.

CAUTION: The structural integrity of the mobile home floor, wall, and ceiling/ roof must be maintained.

Parts Requirements:

MODEL 20

New Buck Corporation

New Buck Corporation

New Buck Corporation

UL Listed and factory approved Chimney Systems:

Simpson Dura-Vent

Simpson Dura-Vent

Security

Security

Selkirk Metal Bestos

Selkirk Metal Bestos

Metal Fab

Metal Fab

Part Description / Part -

Model 20 Room Heater

Outside air pedestal kit #P21B

6” Chimney Connector #MA-6CHIMCNB

6” Double wall chimney connector type DVL

6” 2100o HT Type “DP” Chimney

6” Type DL Double wall connector

6” Security type “ASHT” high temp chimney

6” Model DS Double wall connector

6” Model SSII Type HT chimney system

6” Type DW Double wall connector

6” 2100o HT chimney

Page 20
Image 20
New Buck Corporation 20 Room Heater manual Mobile Home Room Heater Installation, Sleeping Room, Model