Nordyne AND M5S Input To Furnace Btu/hr, Cubic Feet Per Hour Required =, Gas Information

Models: AND M5S SERIES M1B

1 40
Download 40 pages 11.4 Kb
Page 33
Image 33
GAS INFORMATION

GAS INFORMATION

GAS FLOW RATES

TIME FOR

CUBIC FEET PER

 

REVOLUTION

ONE REVOLUTION

 

OF GAS METER

(SECONDS)

1

 

5

10

 

 

10

360

 

1,800

3,600

 

 

 

 

 

12

300

 

1,500

3,000

 

 

 

 

 

14

257

 

12,86

2,571

16

225

 

1,125

2,250

18

200

 

1,000

2,000

20

180

 

900

1,800

22

164

 

818

1,636

24

150

 

750

1,500

26

138

 

692

1,385

28

129

 

643

1,286

30

120

 

600

1,200

32

113

 

563

1,125

34

106

 

529

1,059

36

100

 

500

1,000

38

95

 

474

947

40

90

 

450

900

42

86

 

429

857

44

82

 

409

818

46

78

 

391

783

48

75

 

375

750

50

72

 

360

720

52

69

 

346

692

54

67

 

333

667

56

64

 

321

643

58

62

 

310

621

60

60

 

300

600

62

58

 

290

581

64

56

 

281

563

GAS FLOW RATES

TIME FOR

CUBIC FEET PER

 

REVOLUTION

 

ONE REVOLUTION

 

 

OF GAS METER

(SECONDS)

1

 

5

 

10

 

 

 

66

55

 

273

 

545

 

 

 

 

 

 

68

53

 

265

 

529

 

 

 

 

 

 

70

51

 

257

 

514

72

50

 

250

 

500

74

49

 

243

 

486

76

47

 

237

 

474

78

46

 

231

 

462

80

45

 

225

 

450

82

44

 

220

 

439

84

43

 

214

 

429

86

42

 

209

 

419

88

41

 

205

 

409

90

40

 

200

 

400

92

39

 

196

 

391

94

38

 

191

 

383

96

38

 

188

 

375

98

37

 

184

 

367

100

36

 

180

 

360

102

35

 

176

 

353

104

35

 

173

 

346

106

34

 

170

 

340

108

33

 

167

 

333

110

33

 

164

 

327

112

32

 

161

 

321

114

32

 

158

 

316

116

31

 

155

 

310

118

31

 

153

 

305

120

30

 

150

 

300

Table 13. Gas Flow Rates (Cubic Feet per Hour)

CAPACITY OF BLACK IRON GAS PIPE (CU. FT. PER HOUR)

FOR NATURAL GAS (SPECIFIC GRAVITY - 0.60)

NOMINAL BLACK IRON

 

 

LENGTH OF PIPE RUN (FT)

 

 

PIPE DIAMETER (IN.)

10

20

30

40

50

60

70

80

½

130

90

75

65

55

50

45

40

¾

280

190

150

130

115

105

95

90

1

520

350

285

245

215

195

180

170

 

 

 

 

 

 

 

 

 

1 ¼

1,050

730

590

500

440

400

370

350

1 ½

1,600

1,100

890

760

670

610

 

 

Input To Furnace (Btu/hr)

Cubic Feet Per Hour Required =

Heating Value of Gas (Btu/Cu. Ft.)

NOTE: The cubic feet per hour listed in the table above must be greater than the cubic feet per hour of gas fl ow required by the furnace. To determine the cubic feet per hour of gas fl ow required by the furnace, divide the input rate of the furnace by the heating value (from gas supplier) of the gas.

Table 14. Capacity of Black Iron Gas Pipe (cu. ft. per hour)

for Natural Gas w/ Specific Gravity = 0.60

33

Page 33
Image 33
Nordyne AND M5S Input To Furnace Btu/hr, Cubic Feet Per Hour Required =, Heating Value of Gas Btu/Cu. Ft, Gas Information