Polycom 1725-36028-001 manual Site Preparation, Required Materials

Models: 1725-36028-001

1 110
Download 110 pages 42.86 Kb
Page 19
Image 19
Site Preparation

3

Site Preparation

As shown in the system diagram in the previous section, the SpectraLink 8000 Telephony Gateway is connected to both the Ethernet switch and the wired telephone system; the SpectraLink 8000 SVP Server is connected to the Ethernet switch only. The specifications covered here allow for great flexibility in physical placement of the components within stated guidelines.

This unit must be installed by a service person familiar with the installation of electronic equipment.

Do not power up the unit before it has been properly grounded to a protective earth. See Chapter 6 Install SpectraLink 8000 Telephony Gateway - Grounding instructions.

Required Materials

The customer must provide the following equipment.

Power Outlet(s): Must accept Polycom provided AC adapter, one for each SpectraLink 8000 Telephony Gateway and one for the SpectraLink 8000 SVP Server (if required). For multiple SpectraLink 8000 Telephony Gateway installations, provide power strips with sufficient outlets and built-in power switches to enable the Telephony Gateways to be powered on and off at the same time.

Cross-Connect Block: Required to connect the PBX ports to the SpectraLink 8000 Telephony Gateway(s).

25 Pair Cables: RJ-21 male at SpectraLink 8000 Telephony Gateway end, required to connect each SpectraLink 8000 Telephony Gateway to the cross-connect blocks.

Backboard space: The SpectraLink 8000 Telephony Gateway and the SpectraLink 8000 SVP Server are designed to be wall mounted to 3/4” plywood securely screwed to the wall.

Screws: Required to mount the SpectraLink 8000 Telephony Gateway and the SpectraLink 8000 SVP Server (if required) to the

PN: 1725-36028-001_T.doc

19

Page 19
Image 19
Polycom 1725-36028-001 manual Site Preparation, Required Materials