—Status 1 should be blinking on each SpectraLink 8000 Telephony Gateway

Install SpectraLink 8000 Telephony Gateway

Use only the provided Class II AC Adapter with output 24V DC, 1A.

For proper operation, all SpectraLink 8000 Telephony Gateways must be powered on and off at the same time.

For installations with more than one SpectraLink 8000 Telephony Gateway, use an outlet strip with a built in power switch to allow SpectraLink 8000 Telephony Gateways to be turned on and off together.

2.Plug the AC adapter into an 110V AC outlet or switch on the outlet strip to apply power to the SpectraLink 8000 Telephony Gateway.

3.Verify that leakage current ("touch" current) is below 250 μA rms on exposed metal surfaces.

4.If leakage is excessive, power off the system and re-verify ground path continuity.

5.The system will cycle through diagnostic testing and the LEDs will blink for about one minute. When the system is ready for use:

The E (error) LED should be off on each SpectraLink 8000 Telephony Gateway

Status 1 should be blinking on each SpectraLink 8000 Telephony Gateway

Status 5 should be lit on one and only one SpectraLink 8000 Telephony Gateway. If Status 5 is lit on more than one SpectraLink 8000 Telephony Gateway, the SpectraLink 8000 Telephony Gateways are not correctly connected to one another.