Quadra-Fire MTVERNINSAE-MBK, MTVERNINSAE-CSB owner manual Starter hole Mark area of floor to cut

Models: MTVERNINSAE-CWL MTVERNINSAE-PMH MTVERNINSAE-MBK MTVERNINSAE-CSB

1 56
Download 56 pages 40.26 Kb
Page 10
Image 10

Mt. Vernon Pellet Insert (AE)

G.Removing Metal Floor of Factory-Built Firebox

The fi rebrick (refractory), glass doors, screen rails, screen mesh and log grates can be removed from a factory-built

rebox in order to gain minimum insert opening require- ments.

Any smoke shelves, shields and baffl es may be removed from a factory-built fi rebox if attached with mechanical fas- teners.

The metal fl oor of the factory-built fi rebox may be removed

to facilitate the installation of the insert only when a 1/4 inch (6mm) airspace is provided between the insert and the fl oor of outer wrap.

The following is only one example as there are many differ- ent models of factory-built fi replaces.

Starter hole

Mark area of floor to cut

Figure 10.1. Measure and mark the metal

oor for cutting. With a drill, make a starter hole in each corner.

Figure 10.2. Using a saws-all, cut out the fl oor.

R

Use 2 x 4 from insert packaging to support insert

Figure 10.3. If the fl oor is made of thin metal, we recommend using the 2 x 4 from the insert packaging to support the insert. The 2 x 4 may need to be cut to the appropriate size.

Keep sharp edge of metal floor away from power cord

Figure 10.4. Place the insert into the fac- tory-built fi rebox. Ensure that the power cord can not be damaged by the sharp metal edge. You may need to cut out a notch to accomodate the cord.

Leveling Leg

Figure 10.5. Ensure that the leveling leg is positioned over the 2 x 4 before leveling the insert.

Page 10

7036-135G

November 22, 2011

Page 10
Image 10
Quadra-Fire MTVERNINSAE-MBK, MTVERNINSAE-CSB, MTVERNINSAE-PMH, MTVERNINSAE-CWL Starter hole Mark area of floor to cut