Manuals
/
Regency
/
Household Appliance
/
Indoor Fireplace
Regency
P33-NG4 installation manual Parts List
Models:
P33-NG4
1
46
52
52
Download
52 pages
58.5 Kb
43
44
45
46
47
48
49
50
<
>
Install
Parts list
Vent Termination Locations Section Diagram
Log Replacement
Warranty
Ignitor Wire Piezo Ignitor
Top Standoff Assembly
Lighting Procedure
This allows for small adjustments
Optional REMOTE CONTROL
Page 46
Image 46
PARTS LIST
46
Regency
®
P33-4
Zero Clearance Direct Vent Gas Fireplace
Page 45
Page 47
Page 46
Image 46
Page 45
Page 47
Contents
Direct Vent Gas Fireplace
Installation Manual
P33-4Zero Clearance
Owners
To the New Owner
PARTS LIST
INSTALLATION
MAINTENANCE
WARRANTY
SAFETY LABEL
SAFETY LABEL
5.08 Modifications to NFPA-54,Chapter
REQUIREMENTS
MA Code - CO Detector
OBSTRUCTIONS
IMPORTANT MESSAGE
INSTALLATION
GENERAL SAFETY INFORMATION
BEFORE YOU START
Vent Termination Locations Section Diagram
INSTALLATION CHECKLIST
UNIT DIMENSIONS
LOCATING YOUR FIREPLACE
COMBUSTIBLE MANTELS
CLEARANCES
MANTEL LEG CLEARANCES
Clearance to Combustibles from
Minimum Clearances
FRAMING AND FINISHING
Rigid Vent
Flex Vent
VENTING INTRODUCTION
UNIT ASSEMBLY PRIOR TO INSTALLATION
Top Standoff Assembly
Top Facing Support & Side Nailing Strips
EXTERIOR VENT TERMINATION LOCATIONS
MINIMUM FLEX KIT CENTER-LINE
REGENCY DIRECT VENT FLEX SYSTEM
MINIMUM RIGID PIPE CENTER-LINE
Caps
INSTALLATION PROCEDURES
Caps
RIGID PIPE VENTING SYSTEMS
Alternate
Horizontal
Simpson Dura-Vent
RIGID PIPE VENTING COMPONENTS LIST
Description
Selkirk
Vent must be supported at offsets
RIGID PIPE VENTING ARRANGEMENTS
Vertical Terminations Propane & Natural Gas
Maintain clearances to combustibles
Vent must be supported at offsets
The P33-4is approved for a maximum 40 ft. straight vertical, with rigid pipe vent systems for Propane and Natural Gas
Maintain clearances to combustibles
Simpson Dura-Vent Center-Line
RIGID PIPE VENTING ARRANGEMENTS
REGENCY DIRECT VENT SYSTEM FLEX
Flex Kit Center-Line
Horizontal Venting with Three 3 90o Elbows
INSTALLATION
Horizontal Venting with Two 2 90o Elbows
Horizontal Venting with Two 2 90o Elbows
Vertical Venting with Two 2 90o Elbows
Horizontal Venting with Three 3 90o Elbows
Vertical Venting with Two 2 90o Elbows
Option
Vertical Venting with Three 3 90o Elbows
Vertical Venting with Three 3 90o Elbows
H + H1
Amaximum of two certified joiner kits
VERTICAL TERMINATION WITH CO-LINEARFLEX SYSTEM
Co-linearDV Vertical Termination Cap #
may be used per length. #948-30535 ft 11m
VerticalHeightfeet
The shaded area in the diagrams show
VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
Horizontal Distance Feet
Diagram
UNIT INSTALLATION WITH HORIZONTAL TERMINATION
Diagram
Diagram
Diagram
UNIT INSTALLATION WITH VERTICAL TERMINATION
GAS LINE INSTALLATION
Diagram
HIGH ELEVATION
PILOT ADJUSTMENT
GAS PIPE PRESSURE TESTING
S.I.T. VALVE DESCRIPTION
Assembly to the left and lift out
For P33-4/H25-1Using SIT 820 NOVA Gas Valve
Installation of the LPG Conversion Kit
Pilot assembly is now accessible for steps 4 to
Also check that the pilot and
Do not overtighten the screw. Recommended to grip
the wrench by the short side
main burner injectors
Ground wire from kit
Ignitor Wire Piezo Ignitor
DC Sparker Ignitor Wire
Battery Compartment
PANELS
LOG SET INSTALLATION
OPTIONAL BRICK
Note The logs must not be in the unit
Diagram
Diagram
Diagram
STANDARD FLUSH DOOR
FLUSH LOUVERS
Diagram
Clip locations Clip installed on right side
DOUBLE SCREEN DOOR
Bay Louver Top Heat Shield
BAY LOUVERS
Flush Louver Top Heat Shield
Burner ON/OFF control box
Cut-Out Oblong Hole Cut-Out Top Flange Bottom
FULL SCREEN DOORS
Backside of FullFlange Screen Door Frame Shown
Cut-Outs
Left Side of Bottom Grill Screen Door
Hinge Location Bottom Grill
Hinge
Top Grill
Do not wire millivolt wall switch wire
Optional REMOTE CONTROL
Optional WALL SWITCH
to 120V wire
Thermocouple
WIRING DIAGRAMS
Thermopile
GasPilot
Page
Diagram
INSTALLING THE OPTIONAL FAN
1 Shut the power off
Diagram 3 Use the clip & hook on the side of
COPY OF THE LIGHTING PLATE INSTRUCTIONS
OPERATING INSTRUCTIONS
Gas Inlet
AERATION ADJUSTMENT
LIGHTING PROCEDURE
SHUTDOWN PROCEDURE
CLEAN THE GLASS WHILE IT IS HOT
MAINTENANCE
MAINTENANCE
LOG REPLACEMENT
NORMAL OPERATING SOUNDS OF
THERMOPILE THERMOCOUPLE
Flush Glass Replacement
Bay Glass Replacement
GLASS GASKET
Valve Tray Assembly
INSTALLING VALVE
Diagram 3 Lift out Valve Tray Assembly
Diagram 2 Rear Log Stand & Valve Tray Assembly
PARTS LIST
MAIN ASSEMBLY
PARTS LIST
BURNER & LOG ASSEMBLY
Part Description
FLUSH FRONT & LOUVERS
BAY FRONT & LOUVERS
Page
Conditions
WARRANTY
The Warranty Limited Lifetime
Exclusions
thoroughly before it leaves our door