INSTALLATION
CLEARANCESMANTELS
The clearances listed below are Minimum distances unless otherwise stated:
A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions.
Clearance to Combustibles from:
Back 0" (0mm)
Side 0" (0mm)
Floor 0" (0mm)
Minimum Clearance from Louver to:
Mantel | min. 7" | (177mm) |
| ||||||||||
Ceiling | 36" | (914mm) from top |
| ||||||||||
|
|
|
|
|
| of louvers |
| ||||||
Side Wall | 6" |
| (152mm) |
| |||||||||
Vent | (38mm) Flex |
| |||||||||||
|
|
|
| (32mm) Rigid Pipe |
| ||||||||
Alcove Clearances: |
|
|
|
|
|
|
|
| |||||
Max. Depth | 36" | (914mm) |
| ||||||||||
Min. Width | 52" | (1321mm) |
| ||||||||||
Min. Height | 90" | (2286mm) |
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WARNING
Fire hazard is an extreme risk
if these clearances are
not adhered to.
The HeatWave Duct Kit
and the Heat Release Kit have different clearance and framing
Heat Release Kit requirements, check the HeatWaveand Heat
Release manual for details.
Because of the extreme heat this fireplace emits, the mantel clearances are critical. Combustible mantel clearances from louver are shown in the diagram below.
Note: A
This drawing is to scale at 1:6 (one inch = 6 inches)
Mantel can be installed anywhere in shaded area using the above scale for units with the Flush Front and with the optional Bay Front.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.
MANTEL LEG CLEARANCES
Combustible mantel leg clearances as per diagram below:
Maximum
8 | Regency® |