Regency P42-LP4, P42-NG4 Aeration, Brick Panels, Adjustment, Tab Tab, front, back

Models: P42-LP4 P42-NG4

1 48
Download 48 pages 16.72 Kb
Page 25
Image 25
AERATION

INSTALLATION

AERATION

BRICK PANELS

ADJUSTMENT

The aeration adjustment gears are located on the valve mounting plate and are accessed from underneath through the bottom louver opening.

To access the air shutter loosen the lock nut and then use the allen key to turn the turning gear which will adjust the air shutter. Open the air shutter for a blue fl ame or close it for a yellower

ame. Tighten the lock nut when adjustment is complete. The burner aeration is factory set but may need adjusting due to either the local gas supply or altitude.

CAUTION: Carbon will be produced if air shutter is closed too much. (Should be 3/16"(4mm) open for natural gas and 1/2" (13mm) for propane.)

Note: Aeration Adjustment should only be performedbyanauthorizedRegency® Installer at the time of installation or service.

1)Unhook the 2 spring loaded hooks from the bottom of the fl ush door and lift the Flush Front off the unit.

2)Unwrap the brick pattern panels from the protective wrapping. Handle the panels with care as they can break easily.

Note: The logs must not be in the unit.

3)Remove the metal channel from the fi rebox top, and use it later for installing the top brick panel (refer to Diagram 1).

Metal

Channel

Diagram 1

4)Insert the back brick panel fi rst by carefully slipping it between the back wall of the fi rebox and the rear log bracket.

5)Insert the side panels. Tilt them in towards the middle of the fi rebox and put the bottom front corner in fi rst. Be very careful not to scratch them on the firebox hardware. Place them fl at up against the wall, they should fi t snugly against the top of the fi rebox.

6)Rest the narrow end of the top brick panel on top of the back wall brick panel. Then, with both hands, lift the top panel up.

7)Slot the top metal channel 1/2 way into place onto the top of the panel.

8)Carefully position and push the top panel into position. Make sure the tabs of the metal channel fi t into the baffle openings (refer to Diagram 2). Push downwards to secure the channel and top panel.

Tab

Tab

Diagram 2

9)Ensure all panels are securely in place (refer to Diagram 3).

Diagram 3

(front)

IMPORTANT: Dangerous operating

 

conditions may occur if the panels

 

are broken.

(back)

Regency® P42-4 Zero Clearance Direct Vent Gas Fireplace

25

Page 25
Image 25
Regency P42-LP4, P42-NG4 installation manual Aeration, Brick Panels, Adjustment, Tab Tab, front, back