Ricoh A741 manual Frequently Asked Questions Project Management, What is the purpose of a project?

Models: A741

1 76
Download 76 pages 6.48 Kb
Page 59
Image 59

14 Frequently Asked Questions: Project Management

14.1What is the purpose of a project?

Engineering design projects typically contain a large number of drawings. In order to manage these drawings, they are often grouped by category. Example: for a building drawings can be grouped by structural design, water system, electrical systems etc.

14.2How many groups can be in a project? Projects can contain unlimited groups and sub-groups

14.3How many projects can we manage with A741 Repro System?

Unlimited, depends on the storage space of your computer. The A741 Repro System client can only handle one project at a time.

14.4Do we provide any kind of accounting?

Yes, accounting is standard. For each print/plot job we can select a cost center and/or user ID which will be stored in an accounting database. Multiple accounting databases can be used. From these accounting databases a variety of reports can be generated, e.g. by Cost Center, User ID, print device etc. The databases will be stored in MS-Access format. Apart from the build-in reports, the user has full freedom to generate any type of report by using Microsoft Access.

Print Server Manual

51

A741

Page 59
Image 59
Ricoh A741 manual Frequently Asked Questions Project Management, What is the purpose of a project?