SECTION 6: LINEAR & DOUBLE LINEAR HEATER INSTALLATION

Step 6.3 Burner Tube Installation

Bow Shackle

Hanger Burner Tube

Note:

 

Tubing requires a downward

Offset mounting

slope of 13 mm per 6000 mm

hole must be

away from burner.

to the top.

Weld seam

must be to the

bottom of the tube.

2290 mm ± 250 mm

Description

Part Number

Burner Tube

03051100

Bow Shackle

E0007576

Tube/Reflector Hanger

03090100

Step 6.4 Coupling and Tube Assembly

A Close coupling

B Start slide bar/coupling lock

with tab.

onto coupling.

 

Tab

 

Slide Bar

 

Wide End

Open

Coupling

 

76 mm to

 

101 mm

 

Closed

C Insert tubes into coupling.

D Tighten coupling to join tubes.

 

 

Slide Bar

Orient coupling so that

 

Coupling

 

 

the impact block is in the

 

Tube

2:00 or 10:00 o’clock

 

positions

 

 

Tube

 

 

Tube

Description

Part Number

 

Coupling

01329600

 

Slide Bar/Coupling Lock

01329700

 

Tube

91409408

19 of 75

Page 25
Image 25
Roberts Gorden BH25UT/EF, BH35UT/EF, BH30UT/EF, BH40DL Burner Tube Installation, Coupling and Tube Assembly, Open, Closed