EQUIPMENT CHECKLIST

Equipment Checklist

After unpacking this switch, check the contents to be that sure you have received all the components. Then, before beginning the installation, be sure that you have all other necessary installation equipment.

Package Contents

24-Port Fast Ethernet PoE Switch

AC power cord

Owner registration card

Serial cable

Rack mounting kit

This Installation Guide

Installation and Management Guide CD

Note: An optional stacking connector and cable is also available.

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

3-3

Page 43
Image 43
SMC Networks SMC6826MPE manual Equipment Checklist, Package Contents, Optional Rack-Mounting Equipment