For Machines Mfg. Since 8/09 | P R E P A R A T I O N | SB1024/SB1025/SB1026 |
Spindle Break-In
Complete the spindle bearing
The
To perform the spindle break-in procedure:
1.Successfully perform all the steps in the Test Run section beginning on Page 25.
2.Make sure the spindle is at a complete stop.
3.Set the spindle speed to the low range (refer to Setting Spindle Speed Range beginning on Page 37 for detailed instructions).
4.Start the spindle rotation at a medium speed and let the mill run for 20 minutes.
5.Stop the spindle rotation and allow the spindle to come to a complete stop by itself.
6.Set the spindle speed to the high range, then start the spindle rotation at a medium speed and let the mill run for another 20 minutes.
7.Stop the spindle rotation, and turn the mill OFF.
The spindle
Since the mill head was rotated parallel to the table for shipping purposes, you will need to tram the spindle with the table if your first cut requires a 90° alignment. Refer to the Tramming Spindle section on Page 33 for detailed instructions.
Inspections &
Adjustments
The following list of adjustments were performed at the factory before the machine was shipped:
ss Gib Adjustment | Page 58 |
ssLeadscrew Backlash
Adjustment | Page 59 |
Be aware that machine components can shift during the shipping process. Pay careful attention to these adjustments during operation of the machine. If you find that the adjustments are not set according to the procedures in this manual or your personal preferences,