14" | P R E P A R A T I O N | For Machines Mfg. Since 5/11 |
|
|
|
Preparation Overview
The purpose of the preparation section is to help you prepare your machine for operation. The list below outlines this basic process. Specific steps for each of these points will be covered in detail later in this section.
The typical preparation process is as follows:
1.Unpack the lathe and inventory the contents of the box/crate.
2.Clean the lathe and its components.
3.Identify an acceptable location for the lathe and move it to that location.
4.Level the lathe and either bolt it to the floor or place it on mounts.
5.Assemble the loose components and make any necessary adjustments or inspections to ensure the lathe is ready for operation.
6.Check/lubricate the lathe.
7.Connect the lathe to the power source.
8.Test run the lathe to make sure it functions properly.
9.Perform the spindle
Things You'll Need
To complete the preparation process, you will need the following items:
For Lifting and Moving
•A forklift or other power lifting device rated for at least 25% more than the shipping weight of the lathe (see Product Specifications beginning on Page 8)
•Lifting straps, each rated for at least 25% more than the shipping weight of the lathe
•Guide rods for steading the load when lifting
•Two other people for assistance when moving machine
•Hardwood blocks (see Page 22)
For Power Connection
•A power source that meets the minimum circuit requirements for this machine (review Power Supply Requirements on the next page for details)
•An electrician or qualified service personnel to ensure a safe and
For Cleaning & Assembly
•Cotton rags
•Mineral spirits
•Quality metal protectant oil
•Safety glasses
•Wrench or socket 21mm
•Wrench or socket 19mm
•Floor mounting hardware as needed
•Precision level
•Standard screwdriver #2