TURN-NADOEVS Lathe w/DRO
Scope of Manual
Updates
Customer Service
Manual Feedback
Table of Contents
Warranty
Foreword
Features
About This Machine
Capabilities
General Identification
General identification Model SB1043PF shown
Controls Components
Master Power Switch
Headstock Controls
Control Panel
Carriage
Carriage Feed Clutch Knob
Tailstock
Safety Foot Brake
Foot brake and spindle lever
Product Specifications
Model SB1042PF, SB1043PF, SB1045PF EVS Toolroom Lathe w/DRO
Main Motor
Tailstock Information
Construction
Model SB1059F, SB1060PF, SB1061PF EVS Toolroom Lathe w/DRO
Model Number SB1059F SB1060PF SB1061PF
Main Motor
Headstock Information
Construction
Basic Machine Safety
Understanding Risks of Machinery
F E T Y
Additional Metal Lathe Safety
Additional Chuck Safety
Things Youll Need
Preparation Overview
Typical preparation process is as follows
Full-Load Current Rating
Power Supply Requirements
Availability
Circuit Requirements
Grounding Requirements
440V Operation
Inventory
Installed & Not Shown Qty
Unpacking
Main Inventory 1 Figure Qty
Before cleaning, gather the following
Cleaning & Protecting
Basic steps for removing rust preventative
Location
Lifting & Moving
To lift and move the lathe
Leveling & Mounting
Leveling
Assembly
Bolting to Concrete Floors
Lubricating Lathe
Power Connection
Adding Coolant
Connecting Power
Hot
Test Run
To test run your machine
Engaged
E P a R a T I O N
Spindle Break-In
Recommended Adjustments
Factory adjustments that should be verified
To perform the spindle break-in
Operation Overview
Installation & Removal Devices
Chuck & Faceplate Mounting
Chuck Installation
To install the chuck
Registration Marks
Chuck Removal
To remove the chuck
Jaw Chuck
Scroll Chuck Clamping
Mounting Workpiece
Faceplate
Jaw tightening sequence
Positioning Tailstock
Using Quill
Tailstock
To mount a non-concentric workpiece to the faceplate
Installing Tooling
To install tooling in the tailstock
To offset the tailstock
Offsetting Tailstock
Removing Tooling
Tools Needed Qty
Items Needed Qty
Aligning Tailstock to Spindle Centerline
To align the tailstock to the spindle centerline
Centers
Dead Centers
Removing Center from Spindle
Live Centers
Mounting Dead Center in Spindle
Mounting Center in Tailstock
Removing Center from Tailstock
Mounting Workpiece Between Centers
To install and use the steady rest
Steady Rest
Tool Needed Qty
Follow Rest
Compound Rest
To set the compound rest at a certain angle
Four-Way Tool Post
Installing Tool
To install a tool in the tool post
Aligning Cutting Tool with Spindle Centerline
Top View To set the micrometer stop
Micrometer Stop
To align the cutting tool with the tailstock center
Side View
Manual Feed
Spindle Speed
Power Feed
Setting Spindle Speed
Power Feed Controls
Gearbox range lever
Apron feed selection and direction knobs
Setting Power Feed Rate
Example Power Feed Rate of 0.0025/rev
Alternate End Gear Configuration
End Gears
Standard End Gear Configuration
Configuring End Gears
Headstock & Gearbox Threading Controls
Threading Controls
Example Metric Thread Pitch of 2.5mm
Apron Controls
Engaged
Thread Dial
Thread Dial Chart
TPI Divisible By
⁄2 Fractional TPI
Even TPI Not Divisible By
Odd Numbered TPI
⁄4 or 3⁄4 Fractional TPI
Chip Drawer
Coolant System
Rod Support
To use the coolant system on your lathe
SB1272-Collect Attachment
Accessories
SB1279-10 Pc. Precision 5-C Collet Set
SB1271-Taper Attachment
Maintenance Schedule
South Bend Lathe Co. Lathe Monthly Maintenance Chart
Lubrication
Oil Pressure Safety Switch
Headstock
Changing Headstock Oil
Checking & Adding Oil
Items Needed Qty
To to change the headstock oil
Draining headstock oil
Draining Oil
Quick-Change Gearbox
Apron
Checking Oil Level
One-Shot Oiler
Draining Oil & Flushing Reservoir
Longitudinal Leadscrew
Ball Oilers
Handling & Care
End Gears
Lubricating
Coolant System Service
Hazards
Changing Coolant
Adding Fluid
To change the coolant
Machine Storage
To prepare the lathe for storage
Compound Rest
Backlash Adjustment
Cross Slide
Gib Adjustment
Leadscrew End Play Adjustment
To remove leadscrew end play
Front saddle gib adjustment screw Carriage Lock Clamp
To adjust the V-belts
Half Nut Adjustment
To adjust the half nut
Belts
Needed Qty
Brake Service
To replace the brake shoes
Brake switch
Leadscrew Shear Pin Replacement
To replace the shear pin
Shear pin access
Gap Insert Removal & Installation
Gap Removal
Gap Installation
TR O U B L E S H O OTI N G
Broken gear or bad bearing Replace broken gear or bearing
TR O U B L E S H O OTI N G
Electrical Safety Instructions
Wiring Diagram Color KEY
Correcting Phase Polarity
To correct wiring that is out of phase
Wiring Overview
ON/OFF
Component Location Index
Component location index
Electrical Box Wiring
Page100
RPM Sensor
Electrical Box
Electrical box
Oil Pump Motor & Pressure Sensor
Spindle Motor
Motor
Spindle Switch
Coolant Pump
Control Panel
Disconnect
Additional Components
Pontnet
Headstock Housing
Headstock Housing Parts List
Description
Headstock Gears
122
105
Headstock Gears Parts List
Pipe Plug 1/2 NPT
Gearbox
Gearbox
Gearbox Parts List
Description
110
Apron
Turn-NadoEVS LathesP a R T SFor Machines Mfg. Since 3/11
Apron Parts List
114
Tool Post & Compound Rest
720 723 724 719 726 716
Saddle & Cross Slide
825
117
Saddle & Cross Slide Parts List
118
Bed & Shafts
Bed & Shafts Parts List
BED GAP Piece SB1059F
End Gears SB1042PF, SB1043PF, SB1045PF
1016 1002 1001 1007 1006
End Gears SB1059F, SB1060PF, SB1061PF
Motor & Headstock Oil System
Motor & Headstock Oil System Parts List
PVA79
Stand & Panels SB1042PF-43PF, SB1059F-61PF
Stand & Panels Parts List SB1042PF-43PF, SB1059F-61PF
PW03M Flat Washer 6MM
Stand & Panels SB1045PF
Stand & Panels Parts List SB1045PF
Upper Catch Tray
1312
Steady Rest
Micrometer Stop Thread Dial
1558 1550 1551 1552 1554 1553 1555 1556 1559 1560
Brake
Upper Bracket Mount
Electrical Cabinet & Control Panel
Control Panel Viewed from Behind
1819 1802 1801 1803
Front Machine Labels
1910
Rear Machine Labels
Warranty
#BLJBTS14125