4.2. Re moving/re plac ing scraper in the SDD dos ing sta tion
Re moving the scraper
Empty the dos ing sta tion.
ยปSwitch the con trol unit off by means of the on/off switch.
Dis con nect from mains volt age.
Open the tight en ing strap (B) on
the dos ing hop per.
Re move the dos ing hop per from
the dos ing unit.
Open the safety screws at the tog -
gle-type fas ten ers.
Open the tog gle-type fas ten ers on
the dos ing mo tor.
Re move the dos ing unit from the
dos ing mo tor.
Re move the cover from the con -
nect ing piece (D).
Loosen the two screws (C) on the
un der side of the dos ing unit hous -
ing (E).
Re move the scraper (A).
LWhen han dling the scraper be care ful, the scraper is sharp.
Dan ger of in jury ex ists!
176-1MS
SDD 1 SGM
Main te nance 4-4