Stovax Studio 22 Site Requirements, Flue and Chimney Requirements, Installation Instructions

Models: Studio 22

1 39
Download 39 pages 10.91 Kb
Page 12
Image 12
SITE REQUIREMENTS

INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

1. Flue and Chimney Requirements

Note: This appliance must only be installed with the flue supplied.

You must adhere to the following:

1.1The flue must be sited in accordance with BS5440: Part 1 (latest edition). See Diagram 1.

1.2Fit a guard to protect people from any terminal less than 2 metres above any access such as level ground, a balcony or above a flat roof.

1.3All vertical and horizontal flues must be securely fixed and fire precautions followed in accordance with local and national codes of practice.

1.4A restrictor may be required. Refer to Technical Specifications on page 9.

1.5Three types of flue termination are possible, rear, top exit horizontal and top exit vertical. To measure for a top exit horizontal terminal:

Decide on the terminal position

Measure the height from the top of the appliance to the centre of the required outlet.

For minimum and maximum flue dimensions see Section 2, Flue Options.

Allow enough room either above or to the side of the appliance to assemble the flue on top

Assemble a horizontal flue in the following order:

-Vertical section

-90° elbow

-Horizontal plus terminal

Support the opening of a masonry installation with a lintel.

1.7Only the horizontal terminal section can be reduced in size.

1

UK Dimensions

12

Page 12
Image 12
Stovax Studio 22 manual Site Requirements, Flue and Chimney Requirements, Installation Instructions