1 |
| I | Tightening torque | I |
| I |
I |
|
| I |
Install the ignition coil to the crankcase. Adjusttheair gap between the ignition coil andthe flywheel using a thickness gauge (filler gauge) and tighten the bolts.
Tightening torque
A
Fig.
(1) Install the intake pipe to the cylinder head with gasket. | |||
| M6 | X 25mm flange | |
M8 | X 28mmboltandwasher | 3 pcs. | |
|
| Tightening torque |
|
Then put the gasket and the insulator on the intake pipe.
54-15 CARBURETOR
Install the gasket and the carburetor to the intake pipe.
54-16 GOVERNOR SYSTEM
(1)Connect the governor lever and the throttle lever on carburetor with governorrod and rod spring. Install the governor leveron the governor shaft.
(2)Installthespeedcontrollevertothecylinder head.
GOVERNOR LEVER
Fig.
- 40 -