Subaru Robin Power Products RGV6100, RGV4100 service manual TheIDELCONTROLUNIT

Models: RGV4100 RGV6100

1 82
Download 82 pages 24.58 Kb
Page 76
Image 76

IDLE CONTROL UNIT with circuit tester.

 

 

1Terminal2

nu3mber4of

5

 

 

(6) Checking the IDLE CONTROL UNIT (RGV6101)

 

9

theIDELCONTROLUNIT

 

 

Check the resistance between five leads of

 

8

7

6

 

 

 

 

 

 

 

 

 

 

 

Fig. 2-19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Circuitpowertestersource(with1.battery5V)

 

Applyblack-�needleofthecircuitbreaker

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

 

3

4

5

 

6

 

7

8

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

-------

110 k�

∞�

110 k�

∞�

 

∞�

110 k�

50 k�

50 k�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

110 k�

-------

 

∞�

110 k�

∞�

 

∞�

110 k�

50 k�

50 k�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

∞�

∞�

 

-------

∞�

∞�

 

∞�

 

∞�

∞�

∞�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

circuitneedleApplybreakrredofthe+

4

110 k�

110 k�

∞�

-------

∞�

 

∞�

110 k�

50 k�

50 k�

 

5

∞�

∞�

350 k�

∞�

-------

 

∞�

 

∞�

∞�

∞�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

∞�

∞�

 

∞�

∞�

∞�

 

-------

 

∞�

∞�

∞�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

110 k�

110 k�

∞�

110 k�

∞�

 

∞�

 

-------

50 k�

50 k�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

85 k�

85 k�

 

∞�

80 k�

∞�

 

∞�

 

80 k�

-------

0 Ω�

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

85 k�

85 k�

 

∞�

80 k�

∞�

 

∞�

 

80 k�

0 Ω�

-------

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table. 2-7

2-5-2 ENGINE SPEED IS NOT REDUCED WHEN LOAD IS OFF.

(1)Check the distortion of the SOLENOID BRACKET as shown in step 2-5-1-(1).

(2)Check the wiring of SOLENOID.

Check two leads from SOLENOID are securely connected.

(3)Check the wiring of IDLE CONTROL UNIT.

Check all leads from IDLE CONTROL UNIT are securely and correctly connected.

(4)Checking the SOLENOID.

Measure the resistance between two leads

SOLENOID

 

from SOLENOID.

 

Normal Resistance

25 - 31 Ω

If the resistance is larger or smaller than this range,

SOLENOID is defective,

Replace with a new one.

Fig. 2-20

- 73 -

Page 76
Image 76
Subaru Robin Power Products RGV6100, RGV4100 service manual TheIDELCONTROLUNIT