SUPER MICRO Computer 6012L-6 user manual Installing the Server into the Rack

Models: 6012L-6

1 108
Download 108 pages 9.86 Kb
Page 21
Image 21

Chapter 2: Server Installation

bly to the other side of the rack, making both are at the exact same height and with the rail guides facing inward.

Installing the Server into the Rack:

You should now have rails attached to both the chassis and the rack unit. The next step is to install the server into the chassis. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). See Figure 2-3.

When the server has been pushed completely into the rack, you should hear the locking tabs "click". Finish by inserting and tightening the thumbscrews that hold the front of the server to the rack.

Figure 2-3. Installing the Server into a Rack

2-5

Page 21
Image 21
SUPER MICRO Computer 6012L-6 user manual Installing the Server into the Rack, Installing the Server into a Rack