Teledyne 3160 manual Installation, Unpacking the Analyzer, Front Panel, Qty Description

Models: 3160

1 68
Download 68 pages 31.18 Kb
Page 19
Image 19

Installation 3

Installation

Installation of the analyzer includes:

1.Unpacking the system.

2.Recognizing the necessary precautions when installing the system.

3.Hooking up the sample/span gas and air supply to appropriate connections.

4.Installing the Micro-Fuel Cell sensor(s).

5.Hooking up electrical connections.

6.Testing the system.

3.1Unpacking the Analyzer

The analyzer is shipped with all the materials and special items you need to install and prepare the system for operation. Carefully unpack the analyzer and inspect it for damage. Immediately report any damage to the shipping agent. Remove the packing slip and verify that you have received all the components listed in Table 3-1.

 

Table 3-1. Accessory Kit for Model 3160

Qty

Part No.

Description

3

G285

Weld glands, VCR-type

3

G284

Gaskets, VCR-type

3

N284

Nuts, female (Hoke 4NM316)

2

W64

Wrench, Open End, 3/4"–5/8"

1

M52973

Instruction Manual

3.2Front Panel

The Model 3160 front and rear panels are illustrated in Figure 3–1 on the follow- ing page. The front panel contains the following displays and controls:

1.Main power switch.

2.Light Emitting Diode (LED) display: the O2 concentration is displayed in bold lettering.

TELEDYNE ANALYTICAL INSTRUMENTS

3-1

Page 19
Image 19
Teledyne 3160 manual Installation, Unpacking the Analyzer, Front Panel, Qty Description