Installation 3
Installation
Installation of the analyzer includes:
1.Unpacking the system.
2.Recognizing the necessary precautions when installing the system.
3.Hooking up the sample/span gas and air supply to appropriate connections.
4.Installing the
5.Hooking up electrical connections.
6.Testing the system.
3.1Unpacking the Analyzer
The analyzer is shipped with all the materials and special items you need to install and prepare the system for operation. Carefully unpack the analyzer and inspect it for damage. Immediately report any damage to the shipping agent. Remove the packing slip and verify that you have received all the components listed in Table
| Table | |
Qty | Part No. | Description |
3 | G285 | Weld glands, |
3 | G284 | Gaskets, |
3 | N284 | Nuts, female (Hoke 4NM316) |
2 | W64 | Wrench, Open End, |
1 | M52973 | Instruction Manual |
3.2Front Panel
The Model 3160 front and rear panels are illustrated in Figure
1.Main power switch.
2.Light Emitting Diode (LED) display: the O2 concentration is displayed in bold lettering.
TELEDYNE ANALYTICAL INSTRUMENTS |