6. OUTLINE OF PREPARATION PROCEDURE BEFORE OPERATING THE ECR

EO1-11095

6.OUTLINE OF PREPARATION PROCEDURE BEFORE OPERATING THE ECR

6.OUTLINE OF PREPARATION PROCEDURE BEFORE OPERATING THE ECR

This chapter shows the outline of set-up procedure of the ECR before actually starting the ECR operation.

WARNING!

Turn the POWER SWITCH to OFF before connecting the power cord.

1 Remove the cash register from the carton, referring to Chapter “2. Unpacking” . And take out all the parts and accessories.

(1)

(2) (3) (7)

(4)

(5)

(6)

(8)

2 Remove the tapes and seals for holding parts or protecting the register surfaces.

3 Plug the power cord of the register into a wall outlet. Make sure that the outlet voltage matches that of the power required for the register.

4 Insert the REG key into the Control Lock.

5 Turn the Mode Lock to the REG position with the power ON.

X MGR

REG -

Z

SET

X MGR

REG -

Z

SET

6-1

Page 15
Image 15
Toshiba MA-1450-1 SERIES, EO1-11095 owner manual Outline of Preparation Procedure Before Operating the ECR, Reg, Set Mgr