13 | Top Section | |
| ||
Tools Needed: | Place the top section in the opening and | |
Hammer | vertically align with lower sections. | |
| ||
Nail | Temporarily secure the top section by | |
driving a nail in the header near the | ||
| ||
Power Drill | center of the door and bending it over | |
the top section. | ||
7/16” Socket | Now flip up the hinge leaf against | |
Driver | section, fastening center hinge(s) first | |
7/16” Wrench | and end hinges last. | |
| ||
Tape Measure |
|
NAIL | door width | |
|
14 | Vertical Track Alignment |
|
|
|
|
| |
Tools Needed: | When installing a door with a |
|
|
Power Drill | TorqueMaster® Plus counterbalance |
|
|
system, vertical track alignment is |
|
| |
|
|
| |
7/16” Socket | critical. Position flagangle between |
|
|
Driver |
|
| |
Tape Measure | from the edge of the door. Tighten the |
|
|
bottom lag screw. Flagangles must be |
|
| |
| parallel to the door sections. Repeat for |
|
|
| opposite side. |
|
|
| IMPORTANT: THE DIMENSION BETWEEN |
|
|
| THE FLAGANGLES MUST BE DOOR WIDTH |
|
|
| PLUS |
|
|
| FOR SMOOTH, SAFE DOOR OPERATION. |
|
|
| Complete the vertical track installation | FLAGANGLE | |
|
| ||
| by securing the center jamb bracket(s) | vertical track |
|
| and tightening the other lag screws. Push |
| |
| ROLLER |
| |
| the vertical track against the rollers so | top section | |
| that the rollers are touching the deepest |
| |
|
|
| |
| part of the curved side of the track (see |
|
|
| illustration). Tighten all the carriage bolts |
|
|
| and nuts. Repeat for opposite side. | ROLLER Against |
|
|
|
| |
|
| VERTICAL TRACK |
|
16
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at