24 | Cable Adjustment | |
| ||
Tools Needed: | Starting on the right hand side, rotate | |
Pliers | the cable drum until the set screw | |
faces directly away from the header. | ||
| ||
Flat Tip | Torque tube cam peak should be |
1/2 wrap Shown
Cam peak
First groove
Screwdriver | pointing straight up. Loosen the set |
Set screw | Right hand drum |
| screw no more than 1/2 turn. Using |
Step Ladder | locking pliers, pull on the end of the |
| cable to remove all cable slack. |
| IMPORTANT: a MINIMUM of a 1/2 |
| wrap IS REQUIRED FOR PROPER DOOR |
| OPERATION. Cable must be taut and |
| in the first groove of the cable |
| drum. |
Cam peak
First groove
Check to ensure the cable is aligned |
and seated in the first groove of the |
cable drum. Snug the set screw, and |
then tighten an additional |
Left side will be adjusted in Step 23. |
IMPORTANT: ENSURE THE CABLE IS |
ALIGNED AND SEATED IN THE FIRST |
GROOVE OF THE CABLE DRUM PRIOR |
TO WINDING SPRINGS. |
Leave approximately 6” of cable and cut |
off the rest. Insert excess cable into hole |
of cable drum. |
NOTE: Illustrations show the right hand |
TorqueMaster® Plus drum, left hand |
TorqueMaster® Plus drum is |
symmetrically opposite. |
Set screw | Right hand drum |
Cable drum hole
Cut cable here
6”
Pliers
24
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at