Windsor 22 SP Before Commissioning, Unloading, Installing the Brushes, Installing the Squeegee

Models: 22 22 SP

1 72
Download 72 pages 54.68 Kb
Page 8
Image 8
Before Commissioning

1Cover dirty water reservoir

2Shut off float

3Dirty water reservoir

4Dust filter (suction)

5Fresh water fill port

6Screw for tank fastening

7Dirty water discharge hose

8Main fuse F1

9Battery *

10Battery socket

11Pedal for driving forward the chassis

12Knobs to exchange the squeegee blades

13Vacuum hose

14Squeegee tool *

15Wing nuts for tilting the squeegee tool

16Wing nuts for fastening the squeegee tool

17Info button

18Display

19Key switch

20Metering switch on/off

21Water quantity regulator

22Emergency-stop button

23Program selection switch

24Overload display brush motor and inter- ruption display

25Battery control display

26Traction switch on/off

27Connection cable for charger

28Squeegee tool lowering lever

29Waste container (Saber Compact 22 SP)

30Brush rollers (Saber Compact 22 SP)

31Cleaning head

32Key for brush rollers (Saber Compact 22 SP)

33Cover for water supply

34Filling level display and fresh water di- scharge hose

35Star grip pushing handle fastening

36Detergent intake

37Control handle

38Push handle

39Disk brushes (Saber Compact 22)

40Splash guard

8English

41Button for advance speed

42Pedal for changing brushes (Saber Compact 22)

* not included in the delivery

Before Commissioning

Unloading

ÎRelease the star grips of the pushing handle fastening.

ÎTurn the pushing handle backwards and tighten the star grips.

ÎPlace long lateral boards of the pak- kaging as a ramp next to the pallet.

ÎFix the ramp on the pallet with nails.

ÎPlace short boards as a support under- neath the ramp.

ÎRemove the wooden bars in front of the wheels.

ÎMove out the pedal to drive out the run- ning gear towards the right and release it upward.

ÎBriefly press the handle downward so that the chassis can drive out.

ÎPush down the machine through the ramp from the pallet.

Installing the Brushes

The brushes must be installed before the in- itial operation (see "Maintenance works").

Installing the Squeegee

ÎInsert the squeegee tool into the squee- gee suspension in such a manner that the profiled sheet is positioned above the suspension. Tighten the wing nuts.

Page 8
Image 8
Windsor 22 SP manual Before Commissioning, Unloading, Installing the Brushes, Installing the Squeegee