Planning the Installation
Planning the Installation
Supplied Parts
❐Link 1000 control panel and 4 mounting screws
❐500 amp precision shunt
❐25 foot RJ11 phone cable
❐Owner’s guide
Materials You Need to Supply
Refer to Figure 2 on page 12.
❐Wire harness to connect the Link 1000 control panel to the shunt and to the positive battery terminal. You can use 18AWG, twisted pair, for this wiring. You can also buy the harness from the dealer you bought the Link 1000 from or from West Marine.
Contact West Marine at:
•
•Fax:
When ordering the harness, quote these part numbers:
•
•
❐Appropriately sized copper cable and connectors to connect the shunt to the battery and the negative bus for DC loads
Consult a local cable supplier about cable size and connector type. You may find it convenient to have the cable supplier attach the connectors.
❐2, 2 amp fuses and fuse holders. (Three fuses and fuse holders if you are monitoring a second battery.)
❐2 screws to mount the shunt
8