TC2 204060 Series BattChg Owners Guide.book Page 30 Friday, July 8, 2011 11:44 AM

Installing Batteries

Two-Stage Charging

The two-stage charging mode employs the following sequence: Bulk and Absorption. It runs similar to the three-stage sequence except that there is no float stage; after the absorption stage the charger stops providing current to the battery and the charger output drops to 9 V (12 Vdc chargers) or 18V (24 Vdc chargers). In this manner, DC loads draw power supplied by batteries and the charger enters a “rest or standby stage.” Like the three- stage sequence, the charger will restart the charging cycle in the Bulk stage if the lowest battery voltage of the three banks drops below 12.5 V (12 Vdc chargers) or 25 V (24 Vdc chargers) for 15 minutes. After seven days, the charger will automatically restart charging in order to refresh the batteries.

 

Vbat = Vabs

lout < 10% lrating

 

 

for 1 minute

 

 

 

 

 

 

for 1 minute

 

Battery Voltage

 

 

 

 

 

 

 

 

 

Vbat = Vgas

 

 

 

 

 

 

for 1 minute

 

 

 

 

 

Vgas voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

GO TO BULK when

Charge

 

 

 

 

Vbat < 12.5 V for

 

 

 

 

15 minutes

start

 

 

 

 

 

 

 

 

 

 

BULK

 

 

ABS

ABS

REST

 

CC

 

CV

 

(Standby)

Time

ABS CV timeout

 

 

max 5 hrs

 

 

 

Start of

 

 

 

REST (Standby)

 

 

 

timeout max 7 days

charging cycle

 

 

 

Total ABS timeout

 

 

max 8 hrs

Figure 10 Two-Stage Charging Process

 

 

30

 

 

Truecharge2 Series Battery Charger Owner’s Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 42
Image 42
Xantrex Technology TC2 204060 manual Two-Stage Charging