Chapter 2 Hardware Installation and Connections

Figure 40 Installation Scenario A

Use the following procedure for this MDF installation scenario.

1Connect the Telco-50 connector end of the cable to the Telco-50 connector labeled USER.

2Connect the wiring on the other end of the Telco-50 cable to the upper ports of the MDF using a punch-down tool.

3Connect the telephone wiring from each end-user’s DSL modem to the lower ports of the MDF.

2.6.4.2 Installation Scenario B

Phone service is available. There is one MDF from which end-users CO connections are made (see next figure). This installation scenario does not apply to G.SHDSL connections.

50

 

IES-5106M / IES-5112M / IES-6000M User’s Guide