SECTION 10: COMMISSIONING

10.7.2 Sequence of Operation

The operating sequence is as follows:

With the external controls on and calling for heat, the burner fan and electric ignition will switch on. After a combustion air purge of approximately twelve seconds, the oil solenoid valve will open and the burner will fire. After another five seconds, the electric ignition is turned off and the burner will go into its normal run position. The photo cell continuously monitors the safe presence of the flame. When the temperature control is satisfied, the control box will turn off all its outputs simultaneously and return to the rest position for the beginning of the next sequence.

10.7.3 Fault Display Messages

On burner failure, the red LED is permanently illuminated for a period of approximately 10 seconds, followed by a brief “dark phase”, then one of the following flash-codes will indicate the cause of the fault. See Table 1 and Table 2. This indication will repeat as long as the lockout reset button is not reset.

Table 1: Fault Display

Flash-Code Key

Message

Flash-Code

Short Pulse

l

Pre-ignition

l l l l .

tv1

 

 

 

 

 

 

 

 

Long Pulse

l

Safety Time

l l .

tv2

 

 

 

 

 

 

 

 

Short Pause .

Delay Time to Valve V2

l l l .

tv2

 

 

 

 

 

 

 

 

Long Pause _

Running

l _

Low Mains Voltage

l l l _

 

 

Table 2: Error Diagnosis

Error Message

Flash-Code

Possible Fault

Lockout

l l l l l

Within lockout safety time,

no flame established.

 

 

 

 

 

 

l l l l l

Stray light during monitor

Stray Light

phase, detector may be

 

 

faulty.

 

 

 

Flash-Code for Manual Lockout

Manual/External

l l l l l _ l l l l l

Lockout

 

 

 

10.7.4 Fault Conditions

If at any stage during normal running the photo electric cell fails to detect the flame, the control will switch off and make an instant restart attempt. If the flame signal is still missing, “lockout” will occur.

If the flame is not detected by the photo cell during a normal start, there will be no restart attempt and “lockout” will occur in approximately 17 seconds after the start.

If a flame is detected during the first 12 seconds (purge), the solenoid valve will not open and the control will “lockout”. For the control sequence, see Page 38, Figure 18.

10.7.5 Switching On

Turn on the heater with the external controls. (Heat ON). If the "Lockout Reset" button is illuminated, press to reset. The combustion air fan and electric ignition should work immediately. Vent the burner oil

pump at the same time by loosening the pump vent port (pump must be running). If the burner goes into "lockout" before the pump has vented, wait one minute, then reset the control box and repeat 10.7.5 until all the air has been vented from the pump and the burner fires.

NOTE: The burner plug and socket may be used to turn off the burner during commissioning.

10.7.6 Adjust Burner Oil Pressure

Adjust the burner oil pressure to the value in the data table for the burner reference letter and burner manufacturer’s information for details of the burner oil pump. When completed, turn off burner and remove test gauge and refit plug.

10.7.7 Set Combustion Air

The combustion air must be set. Measure the emissions in the flue at a point within one metre from the outlet of the heater and adjust for the highest carbon dioxide (CO2) levels obtainable, usually 10.5

-11.0%, while making little or no smoke (smoke number 0-1). The test must be carried out with all covers fitted and after the heater has been running for 15 minutes.

10.7.8 Complete the Commissioning

Test the burner for correct start and stop operation several times. Check that all safety devices operate correctly. Inspect the heater for any oil leaks and repair where necessary.

10.8 Turning Off the Heater (all models)

Set the external controls to the “off” position and the main burner will stop. The fans will run until they are stopped automatically by the fan thermostat.

Do not use Electrical Isolator for control of heater. The Electrical Isolator will switch off the fan. The heat exchanger could be damaged. The Warranty will not cover damage to the heat exchanger if operated improperly.

10.9 External Controls

External controls may include a time switch, room thermostat and frost thermostat. Operate each control to ensure that they function correctly. Set the time switch (if fitted) and room thermostat to the user’s requirements.

10.10 Instruction to the User

Explain the controls of the heater to the user, including how to turn it on and off, using the controls fitted on site.

Give this manual to the user.

Ensure that the user is shown and understands the importance of maintaining clearances to combustibles; the user instructions on Page 40, Section 11 through Page 41, Section 11.4; and all warnings defined in this manual.

39

Image 45
Contents Manual thoroughly before installing or servicing Improper installation, adjustment, alteration, serviceSupplier after leaving the building Immediately call your local gas Follow the gas supplier’sPage Roberts-Gordon LLC Page Table of Figures Page Product Approval Clearances to Combustibles Corrosive ChemicalsNational Standards and Applicable Codes Critical Considerations 3.1 Basic Information Minimum Required Installation ClearancesLocation and Suspension All models VentilationInstallation Clearances and Clearances to Combustibles Dimension Data PGP & POP Internal Heaters Front View all models Side View Models 015All models PGP & POP External Heaters Front View Side View Dimension Data PGP & POP External HeatersRear View Model 015/020/030 040 050 060/070/080 0100Vertical and Horizontal Heaters Air Outlet Spigots top view Outlet Spigot DimensionsModel 015 020 030 040 050 060 070 080 0100 Max 25 mbar 10 in WGMax 45 mbar 18 in WG Maximum Gross Heat Input Min 17 mbar 6.8 in WG Max 25 mbar 10 in WGTechnical Data Ecoflam Oil-Fired Burners burner reference G Light Fuel Oil Gas Oil DataKerosene Data Handling Heater Installation 5.1 GeneralTypical Installation of a Oil-Fired Cabinet Heater Flue Termination Flue Installation 6.1 Flue InstallationRain Collar Joint with highSilicon Sealer Isolated Equipment Rooms AIR Supply 7.1 Air SupplyBuilding Ventilation Distribution DuctingFuel Piping Fuel Pipes Fuel Oil Supply 8.2.1 Fuel Storage TankGravity Feed Systems 4 B. M. Oil LifterPressurised System Installation Duplex System Burner Controls Thermostat Remote ControlsPositioning Room Thermostats or Roberts-Gordon Control Remote Frost ThermostatCCH Wiring Diagram Gas Models 15-30 floor standing CCH Wiring Diagram Oil Models 15-30 floor standing GAS Burner 7-WAY Plug CCH Wiring Diagram Gas Models 15-30 horizontal mountingOIL Burner 6-WAY Plug CCH Wiring Diagram Oil Models 15-30 horizontal mountingCCH Wiring Diagram Gas Models 40-50 floor standing CCH Wiring Diagram Oil Models 40-50 floor standing Outputs Lockout Reset Signal From Burner RUN Signal CCH Wiring Diagram Oil Models 40-50 horizontal mounting CCH Wiring Diagram Gas Models 60-100 floor standing CCH Wiring Diagram Oil Models 60-100 floor standing CCH Wiring Diagram Gas Models 60-100 horizontal mounting CCH Wiring Diagram Oil Models 60-100 horizontal mounting Page Louvers Polarity Test 1 ØElectrical Checks Polarity Test 3 ØCommissioning the Burner gas heaters Initial SettingGas Supply Before Operating the HeaterDescription of Gas-Fired Heater Control Control Gas-Fired HeatersSequence of Operation Motor Starter and Thermal OverloadGas Train Circuit for Dungs Gas Valves all models Combustion Testing all models Throughput AdjusterStart Gas Valves Rate of OpeningComplete the Commissioning Pressure SwitchHigh/Low and Modulating Burners Commissioning the Burner Oil HeatersFault Display Fault Display MessagesError Diagnosis Fault ConditionsHeater Operation high/low or modulating Modulating OperationHigh/Low Operation Pull out for normal operation Press in for constant fanSimple Fault Finding all models Burner Lockout Reset ButtonSimple Fault Finding burner faults Simple Fault Finding oil fired heatersIf you smell gas 12.3 Fan/Motor Assembly Maintenance all models Burner MaintenanceHeat Exchanger Maintenance Servicing 12.1 Servicing InstructionsBurner Conversion Conversion Between Fuels 13.1 GeneralConduct Commissioning procedure as shown on Page 33, Section Conduct Commissioning procedure as shown on Page 33, Section Troubleshoot Ends Oil-Fired Gas-Fired Troubleshooting for Flame Supervision SystemTroubleshooting for Main Fan Circuit 1 Ø Troubleshooting for Solenoid Valves CircuitConduct Commissioning procedure as on Page 33, Section Troubleshooting for Main Fan 3 ØContactor Burner ComponentsOverloads models 060 to Control Circuit Fuse 10 or 5 A, 1-1/4 long sand filledRoberts Gordon Description 015 020 030 040 050 060 070 080 0100 Spare Parts ListPage Page Some objects can catch fire or explode when placed

POP-ECA/PGP-ECA 015 to 0100 specifications

The Roberts Gordon POP-ECA/PGP-ECA 015 to 0100 series represents a significant advancement in the realm of heating technologies, particularly in industrial and commercial applications. These innovative units are designed to provide efficient, reliable heating solutions tailored to meet the diverse needs of various environments.

Main features of the POP-ECA/PGP-ECA series include their high-performance heating capabilities, which allow for rapid temperature rise and consistent heating throughout a space. This efficiency is critical for industries that require precise temperature control for their processes. The units are engineered to emit heat evenly, reducing hot spots and ensuring that the entire area is warmed effectively.

One of the standout technologies incorporated into these heaters is their advanced combustion system. This system optimizes fuel usage, enhancing energy efficiency while minimizing emissions. This aspect is particularly vital in today’s environmentally conscious world, where businesses seek to reduce their carbon footprint. The designs are compliant with current environmental regulations, making them suitable for use in various operational settings.

The POP-ECA/PGP-ECA series also boasts a variety of innovative features aimed at user convenience. Integrated control systems allow for easy adjustments and monitoring, enabling operators to maintain ideal temperature settings with minimal effort. Additionally, many units in the series offer flexible mounting options, allowing for vertical or horizontal installation to suit different space constraints and layout requirements.

Characteristics of the POP-ECA/PGP-ECA series also include robust construction, ensuring durability and longevity even in the most demanding environments. The materials used are resistant to corrosion and wear, providing a reliable heating solution that requires minimal maintenance over time. Moreover, the compact design of the units means that they can be installed in tight spaces without sacrificing performance.

Overall, the Roberts Gordon POP-ECA/PGP-ECA 015 to 0100 series stands as a testament to cutting-edge engineering in heating technology. With their combination of efficiency, environmentally conscious design, and user-friendly features, these units are an excellent choice for a wide range of industrial and commercial heating applications. They exemplify the future of heating solutions, prioritizing performance while remaining mindful of energy consumption and environmental impact.