BCZ2650S/T/SS
6. Set up
IMPORTANT
Tighten the screws gradually by turns.
SE1 |
(1) |
■INSTALLING HANDLE
•Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE1)
(1) About 19 inches (48cm)
U S
SE2
■INSTALLING DEBRIS GUARD
•Put the debris guard on the gear box, attach it with the screws and hardware provided. (SE2)
SE3
■INSTALLING LINE HEAD (SE3)
1. While locking the gear shaft, by inserting the supplied tool into the upper holder on the gear box, loosen and remove the hexagon nut(left- handed)
2. Fit the line head assembly to the gear shaft over the holders.
IMPORTANT
•You need not holder (B) and nut when installing the line head.
•Do not attach any metal blade to BCZ2650T/BCZ2650SS.