
BCZ2650S/T/SS
6. Set up
![]()
IMPORTANT
Tighten the screws gradually by turns.
SE1 |
(1) |
■INSTALLING HANDLE
•Mount the handle to the shaft tube and clamp it at a location that is comfortable to you. (SE1)
(1) About 19 inches (48cm)
U S
SE2
■INSTALLING DEBRIS GUARD
•Put the debris guard on the gear box, attach it with the screws and hardware provided. (SE2)
SE3
■INSTALLING LINE HEAD (SE3)
1. While locking the gear shaft, by inserting the supplied tool into the upper holder on the gear box, loosen and remove the hexagon nut(left- handed)
2. Fit the line head assembly to the gear shaft over the holders.
![]()
IMPORTANT
•You need not holder (B) and nut when installing the line head.
•Do not attach any metal blade to BCZ2650T/BCZ2650SS.