Briggs & Stratton Power Products Home Standby Generator
Installation,
SPECIFICATIONS
Rated Maximum Power (LP*) | . . . . . . . . . .7.0 kW |
Rated Maximum Load Current: |
|
at 240 Volts | . . . . . . . .29.1 Amps |
at 120 Volts | . . . . . . . .58.2 Amps |
Rated AC Voltage | . . . . .120/240 Volts |
Rated Frequency | 60 Hz at 3600 rpm |
Phase | . . . . . .Single Phase |
Power Factor | . . . . . . . . . . . . . .1.0 |
NG Fuel Supply Pressure | |
LP Fuel Supply Pressure |
Normal Operating Range
Output Sound Level . . . | 81 dB(A) at 23 ft. (7 m) at full load |
Shipping Weight | . . . . . . . . . . . . . . . . . . . . . .280 lbs. |
*Natural gas rating will depend on specific fuel but typical derating of generator is between 10 to 20% off the LP gas rating.
AUTOMATIC OPERATION
To select automatic operation, do the following:
2.With generator output supplying load, turn ON service disconnect or main distribution panel circuit breaker that supplies utility power to automatic transfer switch.
3.Automatic transfer switch will transfer loads back to utility power after five minute minimum run time and utility is restored.
4.Generator will run for approximately an additional minute for engine cool down, then shut down.
5.Install control panel access door and roof following instructions in “Removable Roof and Access Door” on page 11.
NOTE: If generator does not shut down after approximately 10 minutes, put AUTO/OFF/MANUAL switch to OFF and contact your local service center.
This completes the test procedures for automatic operation.The Home Standby Generator will now start automatically when utility power is lost and will supply power to the transfer switch.
Servicing the System
To service system:
1.Remove roof by removing four screws and lifting off.
2.Remove screw at top of control panel access door.
1.Set service disconnect or main distribution panel circuit breaker that sends utility voltage to transfer switch to ON.
2.Set generator’s main circuit breaker to ON position.
3.Set AUTO/OFF/MANUAL switch to AUTO.
Checking Automatic Operation
To check the system for proper automatic operation, proceed as follows:
1.Turn OFF service disconnect or main distribution panel circuit breaker sending power to automatic transfer switch.
The generator will crank and start once the utility voltage drops out and the sensor has timed out. Let the system go through its entire automatic operation sequence.
3.Pull access door outward (away) from unit while pulling door upward and out of base. Door will come free of generator enclosure.
4.Set AUTO/OFF/MANUAL switch to OFF.
5.Set generator’s main circuit breaker to OFF position.
6.Pull service disconnect from disconnect box.
7.Remove 15A fuse from control panel.
FAULT DETECTION SYSTEM
The generator may have to run for long periods of time with no operator present. For that reason, the system is equipped with sensors that automatically shut down the generator in the event of potentially damaging conditions, such as low oil pressure, over speed, and other conditions.
A light on the remote LED plate is called the Diagnostic LED.The LED will turn on and off in a series of blinks if certain problems are detected in your Home Standby Generator.The blink pattern is repeated with a brief pause
20