SPECIFICATIONS

Rated Maximum Power (LP*)

. . . . . . . . . .7.0 kW

Rated Maximum Load Current:

 

at 240 Volts

. . . . . . . .29.1 Amps

at 120 Volts

. . . . . . . .58.2 Amps

Rated AC Voltage

. . . . .120/240 Volts

Rated Frequency

60 Hz at 3600 rpm

Phase

. . . . . .Single Phase

Power Factor

. . . . . . . . . . . . . .1.0

NG Fuel Supply Pressure

. . . . . . .5-7 in W.C.

LP Fuel Supply Pressure

. . . . .11-14 in W.C.

Normal Operating Range -20°F (-28.8°C) to 104°F (40°C)

Output Sound Level . . .

81 dB(A) at 23 ft. (7 m) at full load

Shipping Weight

. . . . . . . . . . . . . . . . . . . . . .280 lbs.

*Natural gas rating will depend on specific fuel but typical derating of generator is between 10 to 20% off the LP gas rating.

AUTOMATIC OPERATION

To select automatic operation, do the following:

2.With generator output supplying load, turn ON service disconnect or main distribution panel circuit breaker that supplies utility power to automatic transfer switch.

3.Automatic transfer switch will transfer loads back to utility power after five minute minimum run time and utility is restored.

4.Generator will run for approximately an additional minute for engine cool down, then shut down.

5.Install control panel access door and roof following instructions in “Removable Roof and Access Door” on page 11.

NOTE: If generator does not shut down after approximately 10 minutes, put AUTO/OFF/MANUAL switch to OFF and contact your local service center.

This completes the test procedures for automatic operation.The Home Standby Generator will now start automatically when utility power is lost and will supply power to the transfer switch.

Servicing the System

To service system:

1.Remove roof by removing four screws and lifting off.

2.Remove screw at top of control panel access door.

1.Set service disconnect or main distribution panel circuit breaker that sends utility voltage to transfer switch to ON.

2.Set generator’s main circuit breaker to ON position.

3.Set AUTO/OFF/MANUAL switch to AUTO.

Checking Automatic Operation

To check the system for proper automatic operation, proceed as follows:

1.Turn OFF service disconnect or main distribution panel circuit breaker sending power to automatic transfer switch.

The generator will crank and start once the utility voltage drops out and the sensor has timed out. Let the system go through its entire automatic operation sequence.

3.Pull access door outward (away) from unit while pulling door upward and out of base. Door will come free of generator enclosure.

4.Set AUTO/OFF/MANUAL switch to OFF.

5.Set generator’s main circuit breaker to OFF position.

6.Pull service disconnect from disconnect box.

7.Remove 15A fuse from control panel.

FAULT DETECTION SYSTEM

The generator may have to run for long periods of time with no operator present. For that reason, the system is equipped with sensors that automatically shut down the generator in the event of potentially damaging conditions, such as low oil pressure, over speed, and other conditions.

A light on the remote LED plate is called the Diagnostic LED.The LED will turn on and off in a series of blinks if certain problems are detected in your Home Standby Generator.The blink pattern is repeated with a brief pause

20

Image 20
Contents Installation Start-Up Table of Contents Operate generator only outdoors Important Safety InstructionsDo not dispose of battery in a fire Amp fuse Before working on the equipment Installer Responsibilities Installation AssistanceSave These Customer Instructions Responsibilities IntroductionOil Fill BatteryKnow Your Home Standby Generator Know Your Control Panel AUTO/OFF/MANUALInstallation Procedures Owner OrientationHome Standby Generator Location Shipment ContentsLifting the Generator Device Running Watts Essential CircuitsEssential Circuit Selection Disconnect Box Mounting Guidelines Fuel Inlet DimensionsRemovable Roof and Access Door Gaseous Fuel System Fuel Consumption From FuelTo Home Standby LoadFuel Pipe Sizing 10ft 15ft 20ft 30ft 40ft 50ft 60ft 70ft 80ft 90ft 100ftWithdrawal Rate 32F 20F 10F 30F 40F Fuel Comparison ChartPhysical Properties Propane Natural Gas Wire Connections Before Initial START-UPBattery Connection Charging the BatteryServicing the Battery Fuel Supply SystemInitial START-UP no Load Fuel System SelectionAutomatic Operation Sequence To perform the Set Exercise procedure Setting Exercise TimerInstallation Inspection Specifications Fault Detection SystemAutomatic Operation Servicing the SystemNumber of LED Flashes Fault Description Reset Fault Detection SystemNo LED Discharged Battery Engine Fail To StartGenerator Maintenance Changing Engine Oil and FilterChanging Oil Changing Oil FilterStorage To Clean the GeneratorWhen Calling the Factory Troubleshooting Problem Cause CorrectionBriggs & Stratton Power Products Home Standby Generator Schematic Wiring Diagram Exploded View Main Unit Parts List Main Unit Optional Accessories Not IllustratedDescription Items Not IllustratedExploded View Enclosure Parts List Enclosure Exploded View Control Panel Parts List Control Panel Exploded View and Parts List Alternator HARNESS,Wire DC ChargeADAPTER, Mounting,Alternator SCREW, M5 .8 x 10 TaptiteConsumer Use Years Years or YearSensor de Excitación de Tensión de la Compañía Tabla DE ContenidoManual de Instalación,Arranque y Propietario Advertencia PeligroPrecaución Los generadores producen un voltaje muy poderosoConserve Estas Instrucciones IntroducciónResponsabilidades DEL Cliente Responsabilidades DEL InstaladorConozca SU Generador DE Reserva Etiqueta del Motor Tapón de Llenado y VarillaDe Nivel de Aceite Tapón de Llenado y Varilla de Nivel de Aceite PermiteConozca EL Panel DE Control Fusible deDisyuntor Interruptor Fusible de 15 Amperios Protege los circuitos de control deOrientación Para EL Propietario Procedimientos DE InstalaciónUbicación del Generador de Reserva Contenido de la CajaElevación del Generador Dispositivo Vatiaje de Circuitos FundamentalesSelección de los Circuitos Fundamentales Techo y Puerta de Acceso Desmontables Dimensiones de la Entrada de CombustibleDirectrices de Montaje del Cuadro de Desconexión Sistema DE Combustible Gaseoso Advertencia El generador de reserva viene preparado de fábrica paraConsumo de Combustible Gas Natural Vapor de PLPropano Líquido PL peso específico = Dimensiones de la Cañería de CombustibleGas Natural peso específico = Tasa de consumo 32F 20F 10F 30F 40F Cuadro de Comparación de CombustiblesPropiedades físicas Propano Gas natural Conexiones DE Cables Antes DEL Arranque InicialConexión de la Batería Sistema de Suministro de CombustibleCargar la Batería Servicio la BateríaSecuencia DE Operación Automática Selección DEL Sistema DE CombustibleArranque Inicial SIN Carga Temporizador de enfriamiento del motor Ajuste DEL Temporizador DE EjercicioInspección Posterior a LA Instalación Especificaciones Operación AutomáticaSistema DE Detección DE FallasCantidad de Destellos del LED Descripción de la Falla Restablecimiento del Sistema de Detección de FallasNo se Enciende el LED Batería Descargada Baja Presión de AceiteMantenimiento DEL Generador Cambio del Aceite del Motor y del FiltroCambio del Filtro de Aceite Cambio del AceiteSi Llama a la Fábrica AlmacenamientoPara Limpiar el Generador Reparacion DE Averias Garantía Limitada Manuel dInstallation, Démarrage et Utilisateur Table DES MatièresFonctionnement Automatique Entretien DE LA GénératriceAvertissement NE touchez PAS les fils dénudés ou les boîtiers Responsabilités DE Linstallateur Aide À LinstallationConservez CES Instructions IntroductionFAMILIARISEZ-VOUS Avec Votre Génératrice D’ÉTAT D’ATTENTE Filtre à Air Et Jauge dHuile Filtre à lHuileDisjoncteur Interrupteur FAMILIARISEZ-VOUS Avec LE Tableau DE Commande15 Ampères Procédures Dinstallation Conseils AU PropriétaireEmplacement du Génératrice d’état d’Attente Directives Générales Concernant lEmplacementContenu de la Boîte Soulèvement de la GénératriceAppareil Watts Circuits EssentielsSélection des Circuits Essentiels Toit Amovible et Porte dAccès Dimensions de lOrifice dAdmission du CombustibleDirectives dAssemblage du Boîtier de Débranchement LE Système DE Combustible Gazeux Avertissement Le génératrice d’état d’attente a été réglé en usine pourConsommation de Combustible Gas Naturel Vapeur PLGaz de Pétrole Liquéfié GPL densité = 1,50 Grosseur du Tuyau de CombustibleGaz Naturel densité = 0,65 Charte de Comparaison des Combustibles Propriétés physiques Propane Gaz naturelRaccords DE Fils Avant LE Démarrage InitialBranchement de la Batterie Système dAlimentation en CombustibleRechargez la Batterie Entretien de la BatterieCapteur de Prise en Charge de la Tension de Service Sélection DU Système DE CombustibleDémarrage Initial Sans Séquence DE Fonctionnement AutomatiqueVérification Installation Warranty Registration Box Milwaukee,WisconsinRéglage DE LA Minuterie DU Cycle Dexercice Minuterie de Refroidissement du MoteurCaractéristiques Fonctionnement AutomatiqueSystème DE Détection DES Pannes Entretien du SystèmeClignotements Du Voyant Réarmement du Système de Détection des PannesAucun DEL Batterie déchargée Faible Pression dHuileEntretien DU Générateur Changement dHuile à Moteur et de FiltreChangement du filtre à huile Vidange de lHuileCommunications avec le Fabricant RemisagePour Nettoyer le Générateur Dépannage Remarques Garantie Limitée