Tasks

Recom-

Task

Required

Task

Required

Task

 

Task

 

mended

Comp.

to be done

Comp.

to be done

Comp.

Required

Comp.

 

to be done

(Date-

3 months/

(Date-

Semi-

(Date-

to be done

(Date-

 

monthly

Initials)

Break-in

Initials)

annually

Initials)

Annually

Initials)

1. Disable the unit from operating per the first page warning.

2.Check the engine oil level. Adjust as necessary.

3.Check the engine coolant level. Adjust as necessary.

4.Check the engine coolant

thermal protection level. Correct as necessary.

5. Check the natural gas delivery system on gas engine driven units.

Tighten connections as necessary.

6. Check the air inlets and outlets for debris. Clean as necessary.

7. Check the battery electrolyte level if accessible. Adjust as necessary.

8. Check the battery posts, cables, and charger for loose connections, corrosion, and proper operation. Correct as necessary.

9. Check the unit wiring for loose connections, corrosion, and damage. Correct as necessary.

10.Check the engine accessory drive belts for

wear, weather cracking, and damage. Replace as necessary.

11.Visually inspect the unit looking for leaks, wear or damage, loose connections or components, and corrosion. Correct as necessary.

12.Test the engine and

transfer switch safety devices. Correct and/or adjust as necessary.

22 Bryant

Image 24
Contents Page ‹ Operation and Maintenance ‹ HOW to Obtain ServiceIntroduction Your Bryant Dealer isTable of Contents General Hazards Fire Hazards ‹ Standards IndexTransfer Switch GeneratorAutomatic System Operation Generator AC Connection Systems‹ 1.7.1 LOW OIL Pressure Switch ‹ 1.7.2 High Coolant Temperature Switch‹ 1.7.3 LOW Coolant Level Switch Generator Fuel SystemSpecifications UnpackingFuel Consumption Engine OIL RecommendationsBefore Installation Coolant Recommendations‹ 2.1.1 Nfpa Standards ‹ 2.1.2 Other Published StandardsGenerator Location Basic Standby Electric SystemGenerator Mounting Support Emergency Circuit Isolation MethodTransfer Switch Signal Connections Battery InstallationTotal Circuit Isolation Method Grounding the GeneratorPreparation Before START-UP ‹ 2.10.1 Vented Batteries‹ 2.11.1 Prior to Initial START-UP Control Console Components ‹ 3.1.5 SET Exercise Time Switch ‹ 3.1.3 15 AMP Fuse‹ 3.1.6 System Ready LED ‹ 3.1.4 5 AMP FuseManual Transfer START-UP Engine Governor Adjustments Retransfer and ShutdownAutomatic Operation Weekly Exercise CycleControl Board DIP Switch Settings OFF SET Exercise Time To SET Exerciser TimeIntake Manifold Procedure Cylinder Head ProcedureExhaust Manifold Procedure Cooling System Overload Protection for Engine DC Electrical SystemChecking Fluid Levels ‹ 4.8.11 Changing the Engine AIR Cleaner ‹ 4.8.5 Check Engine Coolant Level‹ 4.8.6 Perform Visual Inspection ‹ 4.8.7 Inspect Exhaust SystemMiscellaneous Maintenance ‹ 4.8.13 Coolant Change ‹ 4.9.3 Battery Maintenance‹ 4.9.1 Cleaning the Generator ‹ 4.9.2 Battery‹ 4.9.4 Battery Replacement Periodic Replacement PartsScheduled Maintenance Service Maintenance Interval InformationLevel Maintenance Level Troubleshooting Points Problem Cause CorrectionBryant Liquid-cooled 25 kW Generator Bryant Liquid-cooled 25 kW Generator Bryant Liquid-cooled 25 kW Generator Electrical Data Electrical Data Electrical Data Electrical Data Electrical Data Electrical Data Electrical Data Electrical Data Anelp Ttbo MO Hold Down Battery 2.5L Ford Battery Post Cover BlackBattery Post Cover RED Boot Battery CablePanel for Access Assembly BASE-DOOR Ground Wire GRD Wire Assy 99HSBAssembly Cover Access Roof ACO & STD Encl 2.5LBryant Assy 2A 12V UL Battery Switch ROC Dpst 125V SPDAssy Wire Fuse Holder Screw Hhtt M5-0.8 X 12 BP19 20 Tank Coolant Recovery Engine 2.5L FordSTARTER, 12 Volt Spring BushingARBC0 Retu E1028A RO19I/N SSA .Y Body Carburetor Assembly Cover AIR CleanerGASKET, AIR Cleaner Adapter Bracket Fuel RegulatorSead L Rotor 390 15KW 1P Direct HSB 2.5L Ford Rotor 390 20KW 1P Direct HSB 2.5L FordRotor 390 25KW 1P Direct HSB 2.5L Ford Rotor 39030AD1 HSB TecumPipe Muffler OUT Pipe Exhaust 2.5L FordMuffler 2.5L Ford Saddle 2 InchHousing Governor Connector Cover Connector HousingASM Motor Stepper Harn GOV 2.5L FordSupport Radiator 2.5L AL TAL RADIATOR, 2.5L FordHOSE, 2.5L Ford Lower VENTURI, 16 FAN 2.5L Ford RadiatorInstallation Diagram Your Warranty Rights and Obligations MANUFACTURER’S Emission Control System Warranty CoveragePURCHASER’S/OWNER’S Warranty Responsibilities Emission Control System Warranty Emission Related Parts Include the FollowingWarranty Schedule