For Husqvarna Parts Call 606-678-9623 or 606-561-4983
7.44 Replace Intermediate Gear
1)Remove bottom pan (Section 7.42).
2)Remove bolts holding lower handle to left side of frame.
NUTS
3)Remove four 1⁄2” nuts that secure the gear and the Auxiliary Plate.
4)Remove bolt through center of gear. NOTE: Inspect pinion on Hex Shaft, if damaged replace. Lubricate Hex Shaft.
5)Replace gear and reassemble reversing the process. Torque nuts at
7.45 Replace Drive Plate Assembly
3)Remove the 1⁄2” nut holding the clutch rod to the drive control bellcrank.
FRAME SLOT
1)The Drive Belt must be removed from the Engine Pulley. (Section 7.32)
FRAME
BOTTOM
PAN
POWER
STEERING
COVER
DRIVE PLATE
ASSEMBLY
SCREWS
LOWER
FRONT
SCREW
2) If equipped with power steering, remove the
screw holding the power steering cover at |
|
lower front on both sides. | 41 |
|
DRIVE PLATE
ASSEMBLY
SCREWS
4)Remove the 4 screws (2 each side) from the frame that hold the mounting drive plate in place. The zinc plated screws on left side are slightly longer.
5)Remove belt from pulley
6)Slide Drive Plate Assembly out.
NOTE: Whenever this assembly is removed, it is strongly suggested to lubricate the Hex Shaft with
7)Place belt on pulley in correct position, be sure the clutch rod is through the hole in top left end of plate. Reverse the order to reassemble.
8)The top left corner of the Drive Plate Assembly will fit into Frame Slot.
9)Install 1⁄2” nut at bellcrank so two threads are showing on clutch rod. See Section 6.22.
www.mymowerparts.com