Emerson 000-VA, 5000-10 813mm, Depth, Retaining latch, UPS or battery, Cabinet, Front M4 screws

Page 19

Installation and Configuration

The adjustable rack-mounting brackets (Part#: RMKIT18-32) feature retaining latches to prevent users from inadvertently sliding the UPS or battery cabinet out of the rack.

To install the rack mount brackets:

1.Unpack two (2) rack-mounting bracket assemblies and mounting hardware from this kit. Bracket assemblies are interchangeable between left-hand or right-hand.

Remove inner member of each bracket assembly as shown at right by extending it to its outermost position, depressing the retaining latch and then pulling the inner member out of the bracket assembly.

2.Determine the height position inside the rack enclosure where you want to mount the UPS or battery cabinet.

! CAUTION

Reduce the risk of tipping the rack enclosure by placing the UPS or battery cabinet in the lowest possible rack position.

3. Install the rear member of each bracket assembly into the

rack enclosure with two (2) M5 screws provided in this kit

(see figure at right). The return flanges on the bracket

assembly fit to the inside of rack mounting rails. Insert

screws loosely (finger-tight) into the top and bottom holes

of the return flange on the rear member. Extend the

bracket assembly by sliding the front member forward

until it touches the front rack mounting rail. Insert two (2)

M5 screws loosely (finger-tight) into the top and bottom

holes of the return flange on each front member. Make sure

that the bracket assemblies are at the same mounting

height on all four (4) rack mounting rails.

4. Get eight (8) M4 screws and eight (8) M4 nuts from the

hardware pack in this kit. Each nut has a locking, nylon

insert that begins gripping the screw when it is halfway

tight. Make sure to tighten the nut and screw completely to

ensure locking action. Fasten the rear member and the

front member together using (4) screws and (4) nuts per

bracket assembly as shown in at right. For maximum

support, insert fasteners for each bracket assembly as far

apart as possible, depending on rack depth, while still

joining both members (see figures at right). Check

alignment of bracket assemblies and TIGHTEN ALL

SCREWS FROM Steps 2 3.

Retaining

Latches

Inner members

Front rack mounting rails

M5 screws

M4 nuts

457mm

(18") rack depth

M4 nuts

Return flanges

Front members

M5 screws

M4 screws

M4 nuts

M4 screws

5. Prepare the UPS or battery cabinet (the “equipment”) for

rack mounting by following instructions in the equipment’s

user manual. The equipment may require additional parts

to be added or parts to be removed for rack mounting. After

it is prepared, lay the equipment in rack-mounting

position. Fasten the inner members from Step 1 to the

equipment on both sides as shown at right with eight (8)

M4 screws provided in the kit. Make sure retaining latch is

near the rear of the equipment as shown (see figure at

right).

813mm

 

(32") rack

M4 nuts

depth

M4 screws

Retaining latch

 

UPS or battery

 

cabinet

Front

M4 screws

13

Liebert® GXT3

Image 19
Contents Liebert GXT3 230V,5000-10,000VA Page Table of Contents Troubleshooting MaintenanceSpecifications Figures Page Important Safety Instructions Information for the Protection of the Environment Glossary of Symbols Introduction System Description Rectifier/Power Factor Correction PFC CircuitBattery Charger InverterDC-to-DC Converter BatteryDynamic Bypass Major Components Main Frame and ElectronicsLiebert GXT3, 5,000 & 6000VA Terminal Block Communication C19 Output PowerRemovable Power Distribution Box Internal Battery PacksWHAT’S Included Connectors Spacers Support Bases Install the Main CabinetInstallation and Configuration Tower UPS InstallationQuantity Rack-Mount UPS InstallationInstalling the Adjustable Rack-Mount Kit-Sold Separately Operation and Display Panel Rotated Clockwise 90 DegreesRetaining latch UPS or battery813mm DepthSlide into the bracket assemblies more easily External Battery Cabinet InstallationExternal battery cabinets connected to 10,000VA Liebert GXT3 Extract These Captive screws Maintenance Bypass Breaker Connect Input/Output PowerUnit Rating Maximum Breaker Rating Electrical specificationsDistribution Box Electrical Connections Branch circuit breaker ratingsOutput Input Configuration Program Configuration Program FeaturesWhat You Will Need Controls and Indicators ON/Alarm Silence/Manual Battery Test ButtonStandby/Manual Bypass Button Battery Level Indicators 5 Green Load Level Indicators 4 Green, 1 AmberUPS status indicators UPS Status IndicatorsUPS Status Indicator Icon Color Description Initial Startup and Electrical Checks Startup Checklist for the Liebert GXT3Operation Put the Liebert GXT3 in Manual Bypass Manual Battery TestDisconnecting Input Power from the Liebert GXT3 Maintenance BypassConnectors IT Power System ConfigurationRemove Screws Communication Any Mode ShutdownCommunication Interface Port Terminal Block CommunicationLiebert IntelliSlot Communication Cards Battery Mode ShutdownOn Battery Low BatteryRepo switch connection diagram Remote Emergency Power OffLiebert MultiLink 6000VA model shown Replacing the Internal Battery PackMaintenance Battery Replacement ProceduresPrecautions Battery Charging5000 & 6000 VA models Checking UPS Functions Checking UPS StatusIndicator Diagnosis/Audible alarm UPS SymptomsTroubleshooting IndicatorsCondition Alarm Audible AlarmAudible alarm description Troubleshooting tableYour UPS has received a signal or command from UPS specifications SpecificationsPower distribution specifications Operating temperature parametersSee Table External battery cabinet specificationsBattery run time, minutes, all models Auto-Learning Battery Run Times Specifications Liebert GXT3 Page Care Ne tIs t Twor k